Cedric Heuchenne

Prof. Dr. Cedric Heuchenne

orcid

Research Focus & Metrics

Academic Career Length

16Years (2011-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
11 July 2014 in Quality and Reliability Engineering International
Verified
Journal Article
Closed access
PDF file
AFAlireza Faraz
Alireza Faraz
ESErwin M. Saniga
Erwin M. Saniga
CHCedric Heuchenne
Cedric Heuchenne

18 May 2021 in The International Journal of Advanced Manufacturing Technology
Verified
Journal Article
Closed access
PDF file
QNQuoc-Thông Nguyen
Quoc-Thông Nguyen
Vicent Giner-BoschVicent Giner-Bosch
Vicent Giner-Bosch
CHCedric Heuchenne
Cedric Heuchenne
Kim Phuc TranKim Phuc Tran
Kim Phuc Tran

6 October 2020 in Journal of Statistical Computation and Simulation
Verified
Journal Article
Closed access
PTP. H. Tran
P. H. Tran
CHCedric Heuchenne
Cedric Heuchenne
In monitoring the coefficient of variation (CV), the variable sampling interval (VSI) type charts are a useful adaptive strategy that has been recently combined with various types of charts, including exponentially weighted moving average (EWMA) and variable sample size (VSS) charts. These combinations lead to desirable control charts with an impressive performance in detecting process shifts or anomalies. However, in these studies, the authors asserted that adaptive type charts are not competitive to monitor downward shifts in the CV. Therefore, they willingly omitted the decrease in process shifts. In this paper, we suggest overcoming this downside by designing two one-sided VSI CUSUM control charts for tracking the CV. The performance of the proposed charts is evaluated by the average time to signal (ATS) criterion. The numerical results show that our proposed adaptive type charts are efficient charts to monitor downward shifts in the CV.

11 July 2020 in Journal of Applied Statistics
Verified
Journal Article
Closed access
PTPhuong Hanh Tran
Phuong Hanh Tran
CHCedric Heuchenne
Cedric Heuchenne
HNHuu Du Nguyen
Huu Du Nguyen
HMHélène Marie
Hélène Marie
We investigate, in this paper, the effect of the measurement error (ME) on the performance of Run Rules control charts monitoring the coefficient of variation (CV) squared. The previous Run Rules CV chart in the literature is improved slightly by monitoring the CV squared using two one-sided Run Rules charts instead of monitoring the CV itself using a two-sided chart. The numerical results show that this improvement gives better performance in detecting process shifts. Moreover, we will show through simulation that the precision and accuracy errors do have a negative effect on the performance of the proposed Run Rules charts. We also find out that taking multiple measurements per item is not an effective way to reduce these negative effects. The proposed Run Rules control charts can be applied in the anomaly detection area.

14 May 2012 in Scandinavian Journal of Statistics
Verified
Journal Article
Closed access
PDF file
HDHolger Dette
Holger Dette
CHCedric Heuchenne
Cedric Heuchenne