Manoranjan De

Dr. Manoranjan De

orcid

Research Focus & Metrics

Academic Career Length

12Years (2015-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications

2 May 2023 in Journal of Ambient Intelligence and Humanized Computing
Verified
Journal Article
Closed access
PDF file
SDSudeshna Devnath
Sudeshna Devnath
MDManoranjan De
Manoranjan De
SMSeema Sarkar Mondal
Seema Sarkar Mondal
MMManoranjan Maiti
Manoranjan Maiti


26 July 2016 in Journal of Intelligent & Fuzzy Systems: Applications in Engineering and Technology
Verified
Journal Article
Closed access
PDF file
MDManoranjan De
Manoranjan De
BDBarun Das
Barun Das
MMManoranjan Maiti
Manoranjan Maiti
Imperfect economic production lot size (EPL) models are considered over different types of uncertain finite time horizons with stock-dependent demand, reliability dependent defective rate and random out-of-control state. Generally in EPL models, defective production starts after the passage of some time from production commencement. So occurrence of defective production is random and imposed here through a chance constraint. Reliability of a machinery system affects on the defective rate and production cost to produce an item. Here unit production cost depends on reliability and production rate and part of it is taken against the environment protection cost. Both linear and non-linear production dependent forms of quality are considered. The problems are formulated as total cost minimization problems with crisp, random, fuzzy, fuzzy-random, rough and fuzzy-rough constraints and solved using generalized reduced gradient method (GRG). Several special cases are derived and numerical experiments are performed to illustrate the general and particular models.

1 February 2020
Verified
Book Chapter
Closed access
PDF file
MDManoranjan De
Manoranjan De
BDBarun Das
Barun Das
MMManoranjan Maiti
Manoranjan Maiti