Peter Nyhuis

Peter Nyhuis

orcid

Research Focus & Metrics

Academic Career Length

28Years (1999-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 January 2009
Verified
Book
Closed access
PNPeter Nyhuis
Peter Nyhuis
HWHans-Peter Wiendahl
Hans-Peter Wiendahl

1 January 2003
Verified
Book
Closed access
PNPeter Nyhuis
Peter Nyhuis
HWHans-Peter Wiendahl
Hans-Peter Wiendahl

1 January 1999
Verified
Book
Closed access
PNPeter Nyhuis
Peter Nyhuis
HWHans-Peter Wiendahl
Hans-Peter Wiendahl

1 September 2007 in International Journal of Flexible Manufacturing Systems
Verified
Journal Article
Closed access
PDF file
PNPeter Nyhuis
Peter Nyhuis
THTobias Heinen
Tobias Heinen
MBMichael Brieke
Michael Brieke

26 January 2022 in IEEE Access
Verified
Journal Article
Open access
AMAlexander Mutze
Alexander Mutze
TLTorben Lucht
Torben Lucht
PNPeter Nyhuis
Peter Nyhuis
Providers of maintenance, repair and overhaul (MRO) services for complex capital goods, such as aircraft engines, which are indispensable for the customers to perform their services, are facing increasing market dynamics as well as constantly growing, diversifying customer requirements. The ability to achieve (the required) high logistics performance is greatly determined by a suitable production configuration. From the strategic definition of goals to the design of suitable supply chain structures as well as planning, controlling and monitoring mechanisms, a multitude of interdependent configuration decisions must be made on different organisational levels at various points in time. At the same time, numerous internal and external influencing variables must be taken into account, observed and continuously examined for configuration-relevant changes. If necessary, suitable reconfiguration measures must be initiated. This article presents an approach to production configuration based on logistics modelling. To handle the multitude of effects and interactions they are translated into a framework for efficient and sustainable production configuration. It consists of four successive levels for the initial configuration as well as an additional module for long-term production configuration monitoring. It serves to review pre-existing configurations in the context of reorganisation projects and enables the target-oriented configuration of internal supply chains.

22 April 2014 in International Journal of Production Research
Verified
Journal Article
Closed access
SESteffen C. Eickemeyer
Steffen C. Eickemeyer
FHFelix Herde
Felix Herde
PIPratik Irudayaraj
Pratik Irudayaraj
PNPeter Nyhuis
Peter Nyhuis