Ashwin Raut

Dr. Ashwin Raut

orcid

Research Focus & Metrics

Academic Career Length

11Years (2016-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 November 2016 in Construction and Building Materials
Verified
Journal Article
Closed access
ARAshwin Raut
Ashwin Raut
CGChristy Pathrose Gomez
Christy Pathrose Gomez

1 January 2021 in Journal of Cleaner Production
Verified
Journal Article
Closed access
KKKhan Asudullah Khan
Khan Asudullah Khan
ARAshwin Raut
Ashwin Raut
CCC. Rama Chandrudu
C. Rama Chandrudu
CSC. Sashidhar
C. Sashidhar

1 February 2017 in Construction and Building Materials
Verified
Journal Article
Closed access
ARAshwin Raut
Ashwin Raut
CGChristy Pathrose Gomez
Christy Pathrose Gomez

6 April 2024 in Heliyon
Verified
Journal Article
Open access
HDHaritha Malika Dara
Haritha Malika Dara
ARAshwin Raut
Ashwin Raut
MAMusa Adamu
Musa Adamu
YIYasser E. Ibrahim
Yasser E. Ibrahim
PIPrachi Vinod Ingle
Prachi Vinod Ingle
Lean management is a strategic approach that is used in construction industry, specifically aims at minimizing and ultimately eliminating non-value-adding activities, commonly referred to as waste, within construction projects. However, an increase in non-value added (NVA) activities within the precast industry has the potential to diminish both productivity and efficiency. The aim of this paper is to investigate the use of lean tools for minimizing NVA activities in the construction industry. A comprehensive literature review, the study identified Unnecessary Inventory (UI), Waiting Time (WT), Overproduction (OP), and Unnecessary Movement (UM) as major NVA activities that affect the precast industry. A structured questionnaire was designed and conducted among precast industry professionals and lean experts to collect data. The data was then analyze using partial least square test–structural equation modelling, including reliability and validity tests, to ensure data quality. Results indicated that the precast industry professionals widely utilized Just-in-time (JIT), Continuous Improvement (CI), and Total Quality Management (TQM) as lean tools to reduce NVA activities. A conceptual path model was developed to assess the impact of Lean tools on NVA activities. The results of the analysis reveal a strong positive relationship between Lean tools and NVA activities, with a β value of 0.654. The findings of this study can be used for improving the productivity of construction projects by focusing on how to minimize NVA activities using lean tools in precast industry.

1 November 2021 in Journal of Building Engineering
Verified
Journal Article
Closed access
RSRanjit J. Singh
Ranjit J. Singh
ARAshwin Raut
Ashwin Raut
AMAnant Lal Murmu
Anant Lal Murmu
JAJameel Mohammed Sardar Ali
Jameel Mohammed Sardar Ali

8 January 2020 in Arabian Journal for Science and Engineering
Verified
Journal Article
Closed access
PDF file
ARAshwin Raut
Ashwin Raut
CGChristy Pathrose Gomez
Christy Pathrose Gomez