Urban air mobility (UAM) enabled by electric vertical take-off and landing (eVTOL) aircraft presents an innovative transportation system for mega-cities. An analysis of the techno-economic feasibility of eVTOL air taxis can provide insights into the development and potential impacts of this emerging mobility solution. This study examines eVTOL configurations and proposes a conceptual model for eVTOL air taxi services. A generic cost–revenue model is developed to evaluate the economic feasibility using the rate of return-on-investment approach. Two critical parameters are identified—maximum voyage and price per kilometer. The modeling analysis shows that eVTOL air taxis can achieve a positive rate of return given realistic assumptions on the critical parameters. Reductions in operating costs and increases in maximum voyage range improve financial viability. With technological advancement, eVTOL air taxis are expected to transform urban transportation by increasing capacity and flexibility. The techno-economic analysis provides useful implications for urban planning and policy regarding this innovative mobility mode.
Time discretization can change whether fixed eVTOL cargo resources admit full service. We combine pooled time–energy exclusion bounds, a sufficient grid-step threshold and independently verified schedules under matched return and battery-restoration conditions. The main bound covers single-origin direct deliveries with depot charging and specified symmetric route resources. A 13-hub Shenzhen scenario uses synthetic demand and an analytical aircraft. Over 32 h, its 15 min grid requires 65.5 aircraft-hours against 64 available, whereas a verified 3 min schedule delivers 25.2 t with zero backlog at every window boundary and restores both aircraft. Coarse-grid exclusions paired with fine-grid witnesses recur in 12 of 27 sensitivity cases, ten of 21 energy/resource settings and two of nine synthetic layouts. Additional comparisons retain linked parameters from two published electric-aircraft concepts across 120 grid–instance arms and a matched 10% energy stress. Four cases for the larger concept retain a 15-to-3 min feasibility contrast in both suites; none is confirmed for the smaller concept. All 96 accepted schedules pass independent nonlinear replay. Published mission-energy and manufacturer-specification checks quantify reduced-model discrepancies without establishing operational validation. The results support instance-specific grid assessment; passing a resource screen alone does not establish service feasibility.