The safe operation of railway train is very important to the safety of the railway system. Therefore, it is necessary to master the failure rules and causes of the railway train devices. However, the current common fault analysis methods have some shortcomings, such as complicated compilation process and insufficient expression. Therefore, we choose to use the knowledge graph technology. Firstly, the common faults of railway train devices are obtained through the statistics of real fault data; secondly, the causes of faults are analyzed and the fault tree is established; thirdly, the ontology of railway train system is modeled according to the idea of fault tree construction; finally, the logical relationship between ontology is established according to the ontology model, and the railway train device fault causality model based on knowledge graph is established.
Supply chain management plays a pivotal role in the smooth execution of prefabricated construction. One key aspect involves strategically placing and sizing buffers to handle uncertainties (e.g., stochastic material lead-times and activity durations) within the prefabricated construction supply chain (PCSC). This study examines three buffering policies based on varying combinations of time and inventory buffers to mitigate stochastic material delays and activity prolongs in PSCS, namely, pure inventory buffering policy, pure time buffering policy, and mixed inventory-time buffering policy. To enable this analysis, we characterize how stochastic material delays originating from off-site supply chains impact project schedules, and then develop mathematical procedures for sizing inventory and/or time buffers under the three buffering policies. Case application and numerical analysis are conducted to investigate the performance of these buffering policies and the impact of the project characteristics on them (e.g., due date and arrival rate). Finally, insights are extracted to assist managers in choosing appropriate policies for projects with different characteristics. In general, combining inventory and time buffers results in better performance, particularly under tight project deadlines and high arrival rates. The pure time buffering policy can also be a viable option in specific situations, allowing managers to have more choices.
In construction projects, a centralized management mode can effectively address the material management issues. Specifically, the Material Management Department (MMD) is responsible for material purchase, storage, and allocation based on the demand information reported by contractors. However, material demand are best observed by the contractors. They may manipulate the material takeoff (i.e. misrepresent the material demand) to increase the expected material allocation and avoid the project delay. Motivated by this situation, this paper focuses on the incentives to elicit truthful reporting from contractors. Cases of having prior information and no prior information about the material takeoff, as well as priority allocation and proportional allocation policies are considered. Under the case of having prior information, an incentive scheme is designed based on the Groves payment rule, while under the case of no prior information, two incentive schemes are designed based on the proper scoring rules. The comparison and numerical analysis show that the total three incentive schemes can induce the MMD to choose a system-optimal inventory plan, as well as satisfy the participation constraints of contractors. Besides, the results also demonstrate that prior information is only the prerequisite for implementing the Groves incentive scheme and cannot improve the performance of the whole system in other aspects.