Knowledge management is rapidly becoming a key organizational capability for creating competitive advantage in the construction industry. The emergence of knowledge management as a key organizational capability for creating competitive advantage poses enormous challenges to executives of construction firms. This paper proposes a model for benchmarking the knowledge management practices of construction firms that can guide and assist construction business executives to meet these challenges. The proposed model incorporates benchmarking and knowledge management concepts with Importance-Performance Analysis (IPA) and Comparative Performance Analysis (CPA) maps. The IPA and CPA maps are visual management tools that have been commonly used for continuous improvements in processes and the performance of firms. Yet they have not been used in the construction management literature or for evaluating the knowledge management practices. The proposed model can be used by construction firms as an internal performance measurement tool to evaluate their knowledge management practices. It can provide powerful diagnostic information to construction business executives of construction firms in order to evaluate their firm’s knowledge management practices, identify their firm’s comparative advantages and disadvantages with regard to each knowledge management practice, and set priorities for managerial actions related to knowledge management practices that need improvement. A real-world case study was conducted by administering a survey to 105 construction firms operating in Turkey and is presented to illustrate the implementation and utility of the proposed model.
The construction industry leads the national economy in developing countries. It involves industrial requirements, such as developing technologies, related expertise, demand variability, high production speed and progress. Firms in the industry use subcontractors to produce fast, effective solutions. Therefore, projects’ success varies depending on subcontractors’ rather than general contractors’ performance. This study aimed to develop a model of selection criteria for subcontractors and measure their impact on project success. Construction firms using subcontractors were chosen as the target group. Data on the selection of subcontractors from 93 construction firms that employ subcontractors in their projects were collected through a survey. The impact of the subcontracting selection factor on projects’ overall performance was presented with five hypotheses and modeled using a structural equation model. The weight of each selection factor in the subcontracting selection and the impact on the overall project were designated in the model by determining the standardized regression weights (β). Four hypotheses were accepted and one rejected. This study may contribute to the prequalification conditions in the process of selecting subcontractors in the future.
29 May 2021 in Düzce Üniversitesi Bilim ve Teknoloji Dergisi
Highway projects are large investment projects and have many risk factors. It is possible to reduce the problems that may affect the success of a project by managing such risk factors through a comprehensive risk management strategy. In this study, it was aimed to determine the significance levels of risk factors faced in highway projects. Risk factors seen in agreement, design and construction stages of highway projects were specified by carrying out a literature review. The specified risk factors were classified under 7 main titles according to the source of risk, and emergence of the relevant risk factor at which stage of the highway project along with which sub-risks was investigated. Risk factors were evaluated by administrating questionnaires to the individuals experienced in highway projects and specialised in their fields. Later on, risk analysis was performed using the decision matrix method and their importance levels were determined. Obtained results suggested that the risk of economic crisis under the title of economic and political risks was the most important risk factor.
10 May 2021 in Çukurova Üniversitesi Mühendislik Fakültesi Dergisi
Bu çalışmada; afet öncesi ve afet sonrasını kapsayan afet yönetimi süreci incelenmiştir. Ülkelerin afet yönetimi performanslarını diğer ülkelerle karşılaştırmalarını sağlayacak bir model geliştirilerek örnek bir uygulama sunulması amaçlanmıştır. Çalışmanın örneklemi 4 farklı ülke için alanında uzman 5 akademisyenin görüşü alınarak belirlenmiştir. Ölçülen risk değerleri bulanık sayılara dönüştürülerek ana risk ve alt risk değerleri oluşturulmuştur. Ülkelerin afet risk yönetimi performansını karşılaştırmak için bulanık ağırlıklı ortalama (FWA) algoritması kullanılmıştır. Elde edilen sonuçlar ülkelerin afet sonrası aşamada afet öncesi aşamaya göre daha başarılı olduğunu ve örneklemde simgesel olarak gösterilen A ülkesinin risk performans değeri en yüksek olduğunu göstermiştir.
5 January 2026 in Balıkesir Üniversitesi Fen Bilimleri Enstitüsü Dergisi
Gelişen teknoloji ile birlikte otomasyon süreci tüm sektörlerde hızla ilerlese de inşaat sektörü insan odaklı geleneksel çalışmayı halen sürdürmektedir. Şantiyelerde birbirinden farklı ve yüksek metrajlı aktivitelerin olmasından dolayı, süre ve maliyetten kazanım sağlama amacıyla iş makinelerinin kullanımını zorunlu kılmaktadır. Bu çalışmada iş makinalarının seçiminde literatürde ön plana çıkan 7 değerlendirme kriteri belirlenmiş, bu kriterlere göre 4 iş makinesinden birinin seçilmesine ilişkin karar alma probleminin analitik hiyerarşi prosesi (AHP)yöntemi ile çözümlenmesi amaçlanmıştır. AHP’nin yapısını oluşturan karşılaştırma matrislerine ilişkin tutarlılık analizleri yapılmıştır. Analiz sonucunda 4 iş makinesi alternatifi arasından en uygunu belirlenmiştir.
25 February 2018 in Balıkesir Üniversitesi Fen Bilimleri Enstitüsü Dergisi
Proje yönetiminin en önemli işlevlerinden biri, sürecin izlenmesi ve kontrolüdür. Proje yönetiminde Kazanılmış Değer Analizi (KDA), maliyet, zamanlama ve teknik performansı birleştiren, iyi bilinen bir yönetim sistemidir. Bu analiz, bir projenin performansını ve ilerlemesini ölçmek ve kontrol etmek için çok önemli bir teknik olup çeşitli sektörlerde kullanılmaktadır. Ayrıca, yaygın kullanılan bir proje kontrol tekniği olduğu ve iş performansının nicel ölçümünü sağladığından kapsamlı inşaat projelerinin yönetim sürecinde de kullanılmaktadır. Bu analiz, maliyet ve zamanlama varyanslarının ve performans endekslerinin hesaplanmasına ve proje maliyetini ve program süresini tahmin etmesine olanak tanır. Bu çalışmada, yapımı tamamlanmış bir inşaat projesine ait bazı iş kalemlerinin Kazanılmış Değer Analizine göre değerlendirmesi yapılmış, süre ve maliyet performanslarına ilişkin analiz sonuçları incelenmiştir.