Purpose: The manufacturing industry has recently faced many environmental issues and pressures due to increased environmental awareness. Business leaders identified that green innovation (GI) is a crucial aspect of sustainable development (SD) and can provide a competitive edge. On the other hand, boosting SD through GI is a complicated network activity involving various partners, and there is a need to transmit or share knowledge equitably and acceptably. Following the natural resource-based view (NRBV), this research presents a novel framework for investigating how green knowledge sharing (GKS) and green dynamic capabilities (GDC) affect green creativity (GC) and GI directly and through GC. Besides, the moderation of mimetic pressure (MP) was also evaluated in these targeted relations, as it is a critical element for enhancing GI in the context of SD.Design/methodology/approach: Data consisted 232 respondents from Pakistani manufacturing industries, and seven substantial hypotheses were verified regarding the direct, mediating and moderating effect of targeted variables in confounding ways using partial least squares structural equation modeling (PLS-SEM).Findings: According to the empirical findings, GKS and GDC positively correlate with GC and GI. Moreover, GKS and GDC significantly and positively impact GI both directly and indirectly. Furthermore, GC partially mediates GI, whereas MP has a significant moderating effect in these relationships.Originality/value: A significant correlation among these constructs was observed, demonstrating the conceptual framework for this study. These findings can assist practitioners and academics gain a better understanding of how to manage and evaluate GI in manufacturing projects at both the project and firm levels. Therefore, policymakers and project managers can enhance GI by focusing more on GKS, GDC, MP and GC.
13 September 2023 in Environmental Science and Pollution Research
The performance evaluation index system was established on the basis of 4E (Efficiency, Economic, Effectiveness, Equity) theory to improve performance evaluation of Public-Private Partnership Projects for Residential Renovation (4P2R). Moreover, the index weighting model was demonstrated based on Ordered Weighted Averaging (OWA). Finally, the cloud model was used for performance evaluation, through the cloud uncertainty reasoning to determine the quantitative performance evaluation index value, the positive reverse cloud to calculate the qualitative performance evaluation index value, and the normal cloud to measure the project performance. The proof-of-concept application shows that the performance evaluation index system and evaluation model can better identify the deficiencies in the project, and provide targeted improvement measures for similar projects in the future.
9 February 2024 in Engineering, Construction and Architectural Management
Purpose: The paper covers mega infrastructure construction supply chain (MICSC) in Engineering-Procurement-Construction (EPC) projects, where the frequent occurrence of risk incidents has greatly affected human life. The research aims to establish a risk evaluation index system for MICSC in EPC projects, exploring what risk factors lead to risk incidents and measure the importance and causality of all these risk factors. Design/methodology/approach: The research applies a combination of quantitative and qualitative analysis methodology to process data sequentially. In the first place, risk factors for MICSC in EPC projects are extracted and identified from literature survey and expert interviews. In the second place, an integration model fuzzy Analytic Hierarchy Process (f-AHP) and fuzzy Decision-making Trial and Evaluation Laboratory (f-DEMATEL) is constructed to comprehensively analyze all these risk factors. Findings: 12 primary risk factors and 36 secondary risk factors comprise the risk evaluation index system for MICSC in EPC projects from 178 literature and 5 professionals. The results indicate that Political Situation (F1), Social Security (F2) and Management Mode (F8) are critical risk factors, where F1 and F2 are cause factors and F8 is an effect factor. Originality/value: There are three main contributions of this paper. First and foremost, from the perspective of the research content, no other study has been able to assess risk factors for MICSC in EPC projects, while embedding nine phases of the whole project life cycle and six subjects of stakeholders into a risk evaluation index system. Additionally, from the perspective of research method, a combined model incorporating f-AHP and f-DEMATEL is constructed to avoid the one-sidedness of a single model. Last but not least, from the perspective of practical significance, focusing on the critical risk factors, a series of effective measures are formulated to make appropriate management decisions for nodal enterprises of MICSC, which can improve their risk management capabilities.
The Belt and Road initiatives related to green development projects are being increasingly considered globally. However, such projects face several risks resulting from stakeholder diversity. Although previous studies attempted to identify the risks caused by stakeholders, they found it difficult to provide a precise boundary to separate the risks attributable to a single stakeholder. This study adopts social network analysis to explore the decisive risks attributed to each stakeholder by considering a project’s stage. The results reveal that contractors take on the most risk and, thus, require real-time monitoring. Furthermore, all stakeholders need to collaborate with one another during the implementation stage of a project to mitigate the occurrence of risk. This study makes three contributions: it (1) provides a theoretical basis for enhancing the understanding of stakeholder theory; (2) offers specific guidelines for monitoring risks; and (3) enables stakeholders to understand their duties in controlling risks. Detailed discussions are provided in the remainder of the manuscript.
10 October 2023 in Engineering, Construction and Architectural Management
Purpose: Existing research on innovation has mainly focused on how to promote technological innovation in megaprojects and management innovation (MI) in megaprojects is still an unknown research field. The purposes of this study are to examine the effect of MI on megaproject performance and how the top management team (TMT) regulatory focus affects the use of MI in projects. At the same time, the moderating effects of project uncertainties are also tested.Design/methodology/approach: On the basis of an explorative/exploitative ambidextrous analysis framework, this study divides MI into two dimensions: explorative and exploitative MI, and integrates the theoretical perspectives of the TMT regulatory focus and project uncertainties into a research model. Taking 314 responses from megaprojects’ TMTs in China as research data, this study empirically tests the above model.Findings: Results show that exploratory MI has a U-shaped relationship with megaproject performance; whereas exploitative MI has an inverted U-shaped relationship with megaproject performance. The TMT promotion focus has a positive effect on exploratory and exploitative MI; and the TMT prevention focus has a negative effect on exploratory MI but has a positive effect on exploitative MI. Project uncertainties have a positive moderating effect on the positive relationship between TMT promotion focus and exploratory MI, whereas it has a negative moderating effect on the negative relationship between the TMT prevention focus and exploratory MI.Originality/value: By empirically measuring the relationship between two types of MIs and megaproject performance, this study clarifies the differential mechanism of the effect of different MIs on megaproject performance. This study also examines the MI of megaprojects from the perspective of the TMT regulatory focus and expounds how changes in uncertainties affect the relationship between the TMT regulatory focus and MI.