The strength of soft rock masses progressively deteriorates under dissolution effects, leading to extensive pore development and structural loosening within the rock matrix. This process induces water and sand inrush phenomena at excavation faces, posing substantial challenges to construction safety. This study systematically investigates the strength degradation mechanisms and engineering disaster evolution of soft rock subjected to water–rock interactions. Utilizing representative water-rich soft rock specimens from a tunnel in central Yunnan, a multi-scale analytical framework incorporating X-ray diffraction mineral analysis systems, triaxial mechanical testing systems for rocks, scanning electron microscopy (SEM), and nuclear magnetic resonance (NMR) was implemented. This integrated methodology comprehensively elucidates the macro–meso damage evolution mechanisms of soft rock under water–rock coupling interactions. The results indicate that as the dolomite content decreases and the impurity content increases, the softening grade of the rock rises, leading to more extensive pore development. Uniaxial compression tests revealed that the Poisson’s ratio of soft rock is significantly higher than that of typical rock. Triaxial compression tests demonstrated that confining pressure has a substantial impact on soft rock, particularly affecting Poisson’s ratio. Increased water content was found to significantly reduce the strength of the soft rock. Compared to loose soft rock, the radial strain of denser soft rock was markedly greater than the axial strain, and the soaking damage effect was more pronounced. This study provides a valuable insight into the mechanical and permeability behavior of soft rock under different conditions, and provides valuable insights into the solutions for soft rock in geological engineering such as tunnel excavations.
Bottom-water coning is a core challenge in the development of high-temperature, high-pressure, high-permeability, and fractured bottom water reservoirs. Taking the Carboniferous reservoir in Xinjiang as the research object, this work uses numerical simulation to optimize key parameters of artificial barriers, water drainage, and nitrogen injection technologies. The results show that an artificial barrier with a 30-m radius and intervention at 60% water cut placed at the reservoir top reduces water coning height by over 40%; water drainage starting after the third production year delays water cut rise by more than 2000 days; and nitrogen injection in the eighth production year at 65 MPa cuts water coning height by 30% to 40%. This work proposes a full-life-cycle phased synergy strategy, integrating early artificial barrier water blocking, mid-term intelligent water drainage pressure reduction, and late nitrogen injection oil stabilization. This work provides a direct and feasible technical paradigm for the efficient development of similar high-temperature, high-pressure, and fractured bottom water reservoirs worldwide.