As having an important part of coordination control in steelmaking process, traditional production planning and scheduling technologies are developed with little consideration of the metallurgy mechanism, leading to lower feasibility for actual production. Based on current situation and requirements of steel plants, this paper focuses on the investigation of the charge plan from the view of metallurgy and establishes a charge planning model concerning the minimization of both the open order amount and the difference in due dates of the orders in each charge. A modified multi-objective evolutionary algorithm is proposed to solve the charge planning model of steelmaking process. By presenting a new fitness function, based on the rule of target ranking and introducing the Elitism strategy to construct the non-inferior solution set, the quality of solutions is improved effectively and the convergence of the algorithm is enhanced remarkably. Simulation experiments are carried out on the orders from actual production, and the proposed algorithm produces a group of optimized charge plans in a short time. The quality of the solutions is better than those produced by a genetic algorithm, modified partheno-genetic algorithm, and those produced manually to some extent. The simulation results demonstrate the feasibility and effectiveness of the proposed model and the algorithm.
The fine description of multi-process operation behavior in steelmaking-continuous casting process is an important foundation for the improvement of production scheduling in steel plants. With sufficient consideration on non-collision movements among cranes, a dynamic simulation model is established by Plant Simulation software to describe the operation behavior of multi-process in the steelmaking-continuous casting process of lacking refining span. The design and implement of simulation are illustrated based on a typical workshop layout of “one converter-one refining furnace-one caster”. The method to avoid the collisions between adjacent cranes is represented in detail. To validate the availability of this model, an actual steel plant without refining span is studied, and simulation experiments are conducted by introducing actual production plans as simulation instances. The simulated findings agree well with the actual results of interest, including the total completed times of simulation instances, the turnover number of ladles, and the transfer times of heats among different processes. Hence, the proposed model can reliably simulate the multi-process operation behavior in steelmaking-continuous casting process.