Ahmad Jamal Harb Arar

Dr. Ahmad Jamal Harb Arar

orcid

Research Focus & Metrics

Academic Career Length

4Years (2023-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
4 January 2023 in International Journal of Construction Management
Verified
Journal Article
Closed access
AAAhmad Jamal Harb Arar
Ahmad Jamal Harb Arar
CPChristine Papineau
Christine Papineau
EPErik Poirier
Erik Poirier
Construction disputes may arise from various situations and have varied consequences throughout the project life cycle. Whilst previous studies examined the leading causes of disputes, there is still a lack of understanding of the differences between the various disputes in terms of severity, probable implications, and outcomes. Specifically, once disputes reach a stage where they must be resolved through binding dispute resolution methods (DRMs), little research has been conducted to understand the impact of these DRMs on project outcomes. The research presented in this paper sought to establish which causes of disputes lead to binding DRMs. A sequential exploratory research design was adopted. First, interviews were conducted with nine construction experts in Quebec, Canada, to evaluate the potential of linking specific causes of disputes with the escalation to binding DRMs. The second phase involved collecting and analysing data from 94 participants through a survey. The findings revealed that unforeseen changes, lack of communication, ambiguities in contract documents, design errors, and work progress delays were the most commonly associated causes of reaching binding DRMs. The paper concluded that alternative approaches such as relational contracts, team integration, and innovative technology and communication tools should be considered to be used as preventative measures.

20 May 2025 in Buildings
Verified
Journal Article
Open access
PDF file
AAAhmad Jamal Harb Arar
Ahmad Jamal Harb Arar
EPErik Poirier
Erik Poirier
SSSHERYL STAUB-FRENCH
SHERYL STAUB-FRENCH
As the adoption of integrated project delivery (IPD) progresses, increasing evidence has highlighted its potential to improve project outcomes. However, as an emerging practice, there remains a lack of structured mechanisms to evaluate the maturity of its implementation, which can limit opportunities for learning and improvement. Therefore, this study introduces an IPD Capability Maturity Model (IPDCMM) to evaluate the maturity of IPD implementation at the project level. This model enables organizations to benchmark their IPD capabilities against established best practices, facilitating structured development and continuous improvement. This model is designed as a post-project assessment tool that evaluates the maturity of IPD practice upon project completion, providing critical insights for learning and future project enhancements. The methodology, underpinned by a pragmatic philosophy and guided by the principles of design science research (DSR), prioritizes achieving practical outcomes (artifact). It combines insights from IPD frameworks, maturity models from other fields, and three case studies. The IPDCMM was developed alongside the IPD Maturity Assessment Tool (IPD-MAT), an artifact validated via evaluation sessions and feedback interviews with key stakeholders of IPD case studies. This model provides a structured framework for assessing IPD implementation maturity and facilitates a pathway for enhancing IPD practices and achieving efficiency in project delivery.

21 April 2025 in Preprints.org
Verified
Preprint
Open access
PDF file
AAAhmad Jamal Harb Arar
Ahmad Jamal Harb Arar
EPErik Poirier
Erik Poirier
SSSHERYL STAUB-FRENCH
SHERYL STAUB-FRENCH
As the adoption of Integrated Project Delivery (IPD) progresses, increasing evidence highlights its potential to improve project outcomes. However, as an emerging practice, there remains a lack of structured mechanisms to evaluate the maturity of its implementation, which can limit opportunities for learning and improvement. Therefore, this study introduces an IPD Capability Maturity Model (IPDCMM) to evaluate the maturity of IPD implementation at the project level. This model enables organizations to benchmark their IPD capabilities against established best practices, facilitating structured development and continuous improvement. This model is designed as a post-project assessment tool that evaluates the maturity of IPD practice upon project completion, providing critical insights for learning and future project enhancements. The methodology, underpinned by a pragmatic philosophy and guided by the principles of Design Science Research (DSR), prioritizes achieving practical outcomes (artifact). It combines insights from IPD frameworks, maturity models from other fields, and three case studies. The IPDCMM was developed alongside the IPD Maturity Assessment Tool (IPD-MAT), an artifact validated via evaluation sessions and feedback interviews with key stakeholders of IPD case studies. This model provides a structured framework for assessing IPD implementation maturity and facilitates a pathway for enhancing IPD practices and achieving efficiency in project delivery.

10 November 2026 in Journal of Construction Engineering and Management
Verified
Journal Article
Closed access
PDF file
AAAhmad Jamal Harb Arar
Ahmad Jamal Harb Arar
EPErik Poirier
Erik Poirier
SSSheryl Staub-French
Sheryl Staub-French
As the construction industry continues to embrace integrated project delivery (IPD) for its widely recognized benefits and efficiency improvements, the number of projects utilizing this approach is growing. Despite this trend, IPD represents a significant departure from the traditional, less collaborative, and less integrated methods that have long dominated the industry. Consequently, practical experience with IPD remains in development. Therefore, a readiness model to evaluate project-team readiness to implement IPD becomes essential in order to target and develop the necessary capabilities. To address this gap, this paper introduces and preliminarily evaluates a project-level IPD readiness model and assessment tool that provides a detailed picture of readiness across IPD capabilities and helps set clear expectations for project stakeholders. The model supports early-stage IPD implementation planning by offering a structured approach to assessing and improving readiness, ensuring that teams, resources, and plans are aligned with the collaborative and integrative demands of IPD. Guided by design science research (DSR) principles, the methodology integrates a thorough understanding of existing gaps, leverages prior knowledge, and then develops and refines the readiness assessment tool, complemented by a case-based application and preliminary evaluation step through two case studies. The Readiness Model includes two main components: an IPD Readiness Framework and an IPD Readiness Assessment Tool that classifies project readiness into five levels—emergent, low, moderate, high, and optimal—providing a structured path for assessing and advancing IPD project preparedness. This model lays the foundation for more standardized and consistent IPD implementation, ultimately contributing to its optimization as a collaborative approach within the construction industry.