The Great East Japan Earthquake on Mar. 11, 2011 triggered huge tsunami waves that attacked Fukushima Daiichi Nuclear Power Plant (Fukushima-1). Units 1, 3, and 4 had hydrogen explosions. Units 1–3 had core meltdowns and released a large amount of radioactive material. Published investigation reports did not explain how the severity of the accident could have been prevented. We formed a study group to find: (A) Was the earthquake-induced huge tsunami predictable at Fukushima-1? (B) If it was predictable, what preparations at Fukushima-1 could have avoided the severity of the accident? Our conclusions were: (a) The tsunami that hit Fukushima-1 was predictable, and (b) the severity could have been avoided if the plant had prepared a set of equipment, and most of all, had exercised actions to take against such tsunami. Necessary preparation included: (1) a number of direct current (DC) batteries, (2) portable underwater pumps, (3) portable alternating current (AC) generators with sufficient gasoline supply, (4) high voltage AC power trucks, and (5) drills against extended loss of all electric power and seawater pumps. This set applied only to this specific accident. A thorough preparation would have added (6) portable compressors, (7) watertight modification to reactor core isolation cooling system (RCIC) and high pressure coolant injection system (HPCI) control and instrumentation, and (8) fire engines for alternate low pressure water injection. Item (5), i.e., to study plans and carry out exercises against the tsunami would have identified all other necessary preparations.
10 November 2022 in ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part B. Mechanical Engineering
The Great East Japan Earthquake on March 11, 2011 triggered huge tsunami waves that attacked Fukushima Daiichi Nuclear Power Plant (Fukushima-1). Units 1, 3, and 4 had hydrogen explosions. Units 1, 2, and 3 had core meltdowns and released a large amount of radioactive material. Published investigation reports did not explain how the severity of the accident could have been prevented. We formed a study group to find what preparations at Fukushima-1 could have avoided the severity of the accident. We concluded that the severity could have been avoided if the plant had prepared a set of equipment, and had exercised actions to take against such tsunami. Necessary preparation included (1) A number of DC batteries, (2) Portable underwater pumps, (3) Portable AC generators with sufficient gasoline supply, (4) High voltage AC power trucks, and (5) Drills against extended loss of all electric power and seawater pumps. The most important preparation was item (5), i.e., to study plans and carry out exercises against huge tsunami. That alone would have identified all other necessary preparations.
Daily load following operation for a Molten Salt Reactor (MSR) was simulated by a DYMOS code. It simulates the reactor core by one-point kinetic equations considering the circulation and transit time of molten salt, also it simulates all plant components including a heat exchanger, a steam generator and a turbine/generator. The authors have verified the DYMOS code for transient results performed at the US experimental reactor MSRE, and results of accident analyses for a 700 MWt molten salt fast reactor based on a combined of detailed 3D thermal/hydraulic code and one-point point kinetic equations. In this paper, daily load-following operation of 100% to 50% (14-1-8-1 hour) for MSR-FUJI is simulated by the DYMOS code. It is shown that MSR-FUJI can be operated only by changing fuel salt flow rate without control rod motion. Also, since xenon poison effect is negligible in MSR-FUJI, the flow rate adjustment pattern is simple.