Building information modeling (BIM) has been widely applied throughout the entire lifecycle of projects in the architecture, engineering, and construction (AEC) industry. The errors in BIM models can lead to significant losses in engineering projects, thus leading to BIM-based model checking (BMC) technology garnering an increasing amount of attention. Despite numerous documents detailing the BMC process, there is a lack of systematic analysis and visualization of existing research. This study employs a combined approach of scientometric analysis and a critical review to survey articles on BMC published from 2008 to 2024 in the Web of Science (WOS) and Scopus databases. The scientific analysis objectively presents the status and evolution of this research field through quantitative data, including publications, authors, and references. Furthermore, the critical review is employed to analyze the content of the articles, summarizing the topics and challenges of current research. Finally, potential promising directions for future development are proposed.
1 April 2025 in Journal of Construction Engineering and Management
An underground utility tunnel (UUT) is essential for the efficient use of urban underground space. However, current maintenance systems rely on patrol personnel and professional equipment. This study explores industrial detection methods for identifying and monitoring natural gas leaks in UUTs. Via infrared thermal imaging gas experiments, data were acquired and a dataset established. To address the low-resolution problem of existing imaging devices, video super-resolution (VSR) was used to improve the data quality. Based on a convolutional recurrent neural network (CRNN), the image features at each moment were extracted, and the time series data were modeled to realize the risk-level classification mechanism based on the automatic classification of the leakage rate. The experimental results show that when the sliding window size was set to 10 frames, the classification accuracy of the CRNN was the highest, which could reach 0.98. This method improves early warning precision and response efficiency, offering practical technical support for UUT maintenance management.