Charalampos Skoulikaris

Dr. Charalampos Skoulikaris

Dr
orcid

Research Focus & Metrics

Academic Career Length

16Years (2011-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
7 January 2019 in Environmental Science and Pollution Research
Verified
Journal Article
Closed access
PDF file
Charalampos SkoulikarisCharalampos Skoulikaris
Charalampos Skoulikaris
AZAntigoni Zafirakou
Antigoni Zafirakou

1 September 2016 in International Journal of Applied Earth Observation and Geoinformation
Verified
Journal Article
Closed access
GOGeorge Ovakoglou
George Ovakoglou
Thomas AlexandridisThomas Alexandridis
Thomas Alexandridis
TCThomas L. Crisman
Thomas L. Crisman
Charalampos SkoulikarisCharalampos Skoulikaris
Charalampos Skoulikaris
George VergosGeorge Vergos
George Vergos

22 February 2022 in Sustainability
Verified
Journal Article
Open access
PDF file
Mohammad Kazem GhorbaniMohammad Kazem Ghorbani
Mohammad Kazem Ghorbani
Hossein HamidifarHossein Hamidifar
Hossein Hamidifar
Charalampos SkoulikarisCharalampos Skoulikaris
Charalampos Skoulikaris
Michael NonesMichael Nones
Michael Nones
The utilization of rubber dams for water supply and irrigated agriculture is becoming an emerging practice in developing countries. In this study, based on the SWOT (strengths, weaknesses, opportunities, threats) analysis, a variety of standards and processes in project management (PM) are integrated within the framework of the strategic management (SM) of an organization responsible for the management of new small-scale hydraulic infrastructures, e.g., rubber dam projects. The most important internal and external factors in PM and organizational SM of rubber dam projects in Iran are initially identified, adapted, and integrated. Thereafter, the factors are weighted, evaluated, and analyzed using the analytic hierarchy process (AHP) and combined SWOT–AHP methods. Based on the results, the total weighted scores of the internal and external factors are 2.353 and 2.718, respectively. Hence, the derived main strategy of the organization is WO. This means that the weakness factors can be reduced through the opportunities available for projects. Finally, a new methodology called “strategy matrix” resulting from “priority matrix” is proposed to prioritize and determine the organization’s possible strategies. The outputs demonstrate the first three priorities as a mix of the main strategy alternatives, e.g., W1O1, W7O1, and W9O1. The organization, hence, is proposed to use the economic benefits of rubber dam projects to further monitor organizational units, the project’s resource management, and the project’s stakeholder management (not the project’s stakeholders). The proposed research could be conceived as a pilot for sustainable management in developing countries, where strategic project management can produce important operational benefits.

28 January 2021 in Environmental Modeling & Assessment
Verified
Journal Article
Closed access
PDF file
Charalampos SkoulikarisCharalampos Skoulikaris
Charalampos Skoulikaris
Christos V. MakrisChristos V. Makris
Christos V. Makris
MKMargarita Katirtzidou
Margarita Katirtzidou
VBVasilios Baltikas
Vasilios Baltikas
Yannis N. KrestenitisYannis N. Krestenitis
Yannis N. Krestenitis

18 December 2021 in Sustainability
Verified
Journal Article
Open access
PDF file
Charalampos SkoulikarisCharalampos Skoulikaris
Charalampos Skoulikaris
Renewable energy sources, due to their direct (e.g., wind turbines) or indirect (e.g., hydropower, with precipitation being the generator of runoff) dependence on climatic variables, are foreseen to be affected by climate change. In this research, two run-of-river small hydropower plants (SHPPs) located at different water districts in Greece are being calibrated and validated, in order to be simulated in terms of future power production under climate change conditions. In doing so, future river discharges derived by the forcing of a hydrology model, by three Regional Climate Models under two Representative Concentration Pathways, are used as inputs for the simulation of the SHPPs. The research concludes, by comparing the outputs of short-term (2031–2060) and long-term (2071–2100) future periods to a reference period (1971–2000), that in the case of a significant projected decrease in river discharges (~25–30%), a relevant important decrease in the simulated future power generation is foreseen (~20–25%). On the other hand, in the decline projections of smaller discharges (up to ~15%) the generated energy depends on the intermonthly variations of the river runoff, establishing that runoff decreases in the wet months of the year have much lower impact on the produced energy than those occurring in the dry months. The latter is attributed to the non-existence of reservoirs that control the operation of run-of-river SHPPs; nevertheless, these types of hydropower plants can partially remediate the energy losses, since they are taking advantage of low flows for hydropower production. Hence, run-of-river SHPPs are designated as important hydro-resilience assets against the projected surface water availability decrease due to climate change.