Seyed Azim Hosseini

Dr. Seyed Azim Hosseini


Research Focus & Metrics

Academic Career Length

7Years (2020-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
15 May 2025 in Construction and Building Materials
Verified
Journal Article
Closed access
SRSaeedeh Rashidian
Saeedeh Rashidian
SHSeyed Azim Hosseini
Seyed Azim Hosseini
MKMohammad Emami Korandeh
Mohammad Emami Korandeh

24 June 2025 in Eng
Verified
Journal Article
Open access
PDF file
SHSeyed Azim Hosseini
Seyed Azim Hosseini
SASeyed Alireza Mansoori Al-Yasin
Seyed Alireza Mansoori Al-Yasin
Mohammad GheibiMohammad Gheibi
Mohammad Gheibi
Reza MoezziReza Moezzi
Reza Moezzi
This study explores the optimization of solar energy harvesting in Truro City in the UK using PVSyst simulations integrated with real-time meteorological data. Focusing on panel orientation, tilt angle, shading, and albedo, the research aimed to enhance both energy efficiency and economic viability of photovoltaic (PV) systems in green buildings. A 100 kWp rooftop solar installation served as the case study. Energy outputs derived from spreadsheet-based models and PVSyst simulations were compared to validate results. Optimal tilt angles were identified between 35° and 39°, and the azimuth angle of 0° yielded the highest energy gain without requiring solar tracking. Fixed configurations with a 5 m pitch showed only a 10% shading loss, requiring 1680 m2 of space and generating an average of 646.83 kWh/m2 monthly. Compared to recent works, our integration of real-time climate data improved simulation accuracy by 6–9%, refining operational planning and decision-making processes. This included better timing of high-load activities and enhanced prediction for grid feedback. The study demonstrates that data-driven optimization significantly improves performance reliability and system design, offering practical insights for solar infrastructure in similar temperate climates. These results provide a benchmark for urban energy planners seeking to balance performance and spatial constraints in PV deployment.


23 August 2023 in Multiscale and Multidisciplinary Modeling, Experiments and Design
Verified
Journal Article
Closed access
PDF file
SHSeyed Azim Hosseini
Seyed Azim Hosseini
HTHossein Maleki Toulabi
Hossein Maleki Toulabi

18 October 2024 in Journal of Engineering and Applied Science
Verified
Journal Article
Open access
PDF file
AMAmir Siah Mansour
Amir Siah Mansour
SHSeyed Azim Hosseini
Seyed Azim Hosseini
HTHossein Maleki Toulabi
Hossein Maleki Toulabi
Today, considering the increased cases of terroristic operations, structural design engineers are starting to acknowledge blast-induced loads alongside other design parameters. Since a blast-induced load exhibits a much shorter period than the natural period of the structure, it is unlikely to induce general damages or stimulate the entire structure immediately after the loading, but rather local damages in individual structural elements are the common form of damage. These local damages, however, can set the scene for the gradual failure of the structure. The present study on structures with moment-resisting frames, buckling-restrained braces (BRBs), and conventional steel braces was conducted through an alternative load path (ALP, also known as column elimination) and exact modeling of the blast on the steel frames was undertaken using LS-DYNA software. In this work, the behavior of three five-story steel frames under a blast-induced load of 100 kg TNT equivalent at a distance of 10 m from the structural columns for a period of 100 ms was investigated. Results of analyzing the blast-induced effect on the frames showed that the frame equipped with buckling-restrained braces (BRB) exhibited improved overall peak displacement across the entire frame, peak induced velocity, and peak induced acceleration by 30%, 30%, and 46%, respectively, as compared to other steel frames exposed to blast loads.

1 January 2026 in International Journal of Engineering
Verified
Journal Article
Open access
PDF file
SMS. K. Mousavi
S. K. Mousavi
SHSeyed Azim Hosseini
Seyed Azim Hosseini
HVH. R. Vosoughifar
H. R. Vosoughifar
RBR. Barandoust
R. Barandoust
GMG. Mohammadi
G. Mohammadi
This study proposes a mathematical model to optimize information management in road and transportation contracting projects under resource constraints, utilizing Critical Chain Project Management (CCPM). A multi-objective optimization framework is developed for multi-project scheduling, balancing time, cost, and quality as core performance indicators. The Particle Swarm Optimization (PSO) algorithm is employed to solve the model due to its efficiency in handling complex, nonlinear problems. The model is validated through a case study of three real-world projects encompassing 24 activities with diverse resource constraints. Compared to the traditional Critical Path Method (CPM), the CCPM-based approach reduces total duration from 68 to 47 days, total cost from 108,680 to 63,710 units, and improves the quality index from 0.412 to 0.5764, achieving a 21-day time saving, 25.97% cost reduction, and 40% quality improvement. Sensitivity analysis reveals that resource availability, particularly resources K2 and K3, significantly impacts outcomes, with K2 limitations increasing duration to 84 days and cost to 88,110 units, and K3 limitations extending duration to 81 days and cost to 86,910 units. These findings demonstrate the model’s effectiveness in enhancing decision-making and resource planning in complex construction environments.