The paper is an exploratory review of Federal Government of Nigeria’s gazettes, agencies reports, intergovernmental documents on water resources policy as primary data source and publications by academia; with the aim to contribute insightfully in the ongoing effort of the government and stakeholders in designing a comprehensive water resources policy. The paper identified contradictions and overlapping statutory responsibility that constituted policy implementation impediments’ and galvanized discourse toward effective implementable policy. A paradigm shift is advocated by making the River Basin Development Authorities (RBDAs) the center stage of the nation’s water resources policy development and implementation. But considering the underdeveloped status of Nigeria, there are three critical sectors whose effective functionalities are synergistic for accomplishing the RBDAs vision. These are Energy, Food and Public Health. It is imperative to temporarily focus the nation’s water policy on them for a period of at least ten years through enactment of “Dedicated Water Resources Bill”. The Bill should only address (1) institutional framework (2) Energy, Food and Public Health security and (3) Integrated water resources management. Work should continue on the comprehensive Water Resources Bill through the process of consultation that promote inclusion, accountability, transparency, and the needs of the vulnerable.Keywords: Nigeria, Policy, Water resources, RBDAs, Development
This paper is a study on financial sustainability of water supply service to the city of Offa, in Kwara State, Nigeria. The value consumers place on water supply and the willingness-to-pay (WTP) for improved service and the factors that influence their preferences were determined using an econometric model. The WTP was estimated using a double-bounded dichotomous model and the mean WTP was found to be 70% higher than the current tariff, while the expected monthly revenue from domestic customers alone was 21 million ($175,000) 1 . The study revealed that the consumers were not satisfied with the level of service but they were willing to pay for improved service and even support reforms that will bring about this change. The mean WTP in practical terms gives social benefit of a policy for the offered service for the affected population. The study outcome shows that the high WTP is a good incentive for private sector involvement in the management of urban water supply.
4 October 2022 in International Review of Applied Sciences and Engineering
The water issue has become a frontier of public debate globally due to public awareness of sustainable development. Nigeria's water resources are under serious threat from inadequate catchment management that includes widespread pollution from indiscriminate waste disposal. Stormwater is now recognized as a valuable resource rather than a nuisance, especially in large urban centers. Growing demand for water has exerted pressure on groundwater via dug well and boreholes scattered virtually in every dwelling in Nigeria. This challenge motivated this investigation of the feasibility of harvesting stormwater for due purposes of supplementing water supply and flash flood management. This study aims at quantification of harvestable stormwater and identification of potential capturing sites using Spatial Hydrological Analysis of GIS model and Synthetic Hydrograph. The result indicated total harvestable stormwater for 24-hr rainfall of 161.3 Mm3 and three available capturing sites of eight depressions identified. This volume is a good incentive to incorporate storm harvesting in overall water resources sustainable management.
25 March 2026 in LAUTECH Journal of Engineering and Technology
This study addresses the critical need for a robust evaluation of water treatment plant performance, with a focus on the level of service at the Agba Dam Water Treatment Plant in Nigeria. The objective was to apply fuzzy set theory for objective assessment. The methodology involved collecting 1664 water quality parameter measurements, including pH, conductivity, turbidity, and total dissolved solids. Of these, 354 valid entries served as performance indicators. These data were integrated into a fuzzy synthetic evaluation model assessing service level against prescribed regulatory and expert limits. The key result showed water quality across all sampled parameters was consistently within limits, with mean values: pH = 7.15, conductivity = 176.62 ?S/cm, turbidity = 1.23 NTU, and total dissolved solids = 87.18 mg/L. Consequently, it's concluded that the Agba Dam Water Treatment Plant delivers an excellent level of service, scoring 2.75 on a defined 3-point fuzzy evaluation scale. This scale was explicitly defined using a Likert-type system with linguistic terms 'Poor', 'Good', and 'Excellent', and was validated by expert biochemists and principal scientists from the plant.