Ammar Elhadi

Dr. Ammar Elhadi


Research Focus & Metrics

Academic Career Length

1Year (2026-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
20 January 2026 in Sustainability
Verified
Journal Article
Open access
PDF file
Abdullah AlshammariAbdullah Alshammari
Abdullah Alshammari
AEAmmar Elhadi
Ammar Elhadi
AIAshraf Osman Ibrahim
Ashraf Osman Ibrahim
Heating, ventilation, and air-conditioning (HVAC) systems dominate energy consumption in hot-climate buildings, where maintaining occupant comfort under extreme outdoor conditions remains a critical challenge, particularly under emerging time-of-use (TOU) electricity pricing schemes. While deep reinforcement learning (DRL) has shown promise for adaptive HVAC control, existing approaches often suffer from comfort violations, myopic decision making, and limited robustness to uncertainty. This paper proposes a comfort-first hybrid control framework that integrates Soft Actor–Critic (SAC) with a Cross-Entropy Method (CEM) refinement layer, referred to as SACEM. The framework combines data-efficient off-policy learning with short-horizon predictive optimization and safety-aware action projection to explicitly prioritize thermal comfort while minimizing energy use, operating cost, and peak demand. The control problem is formulated as a Markov Decision Process using a simplified thermal model representative of commercial buildings in hot desert climates. The proposed approach is evaluated through extensive simulation using Saudi Arabian summer weather conditions, realistic occupancy patterns, and a three-tier TOU electricity tariff. Performance is assessed against state-of-the-art baselines, including PPO, TD3, and standard SAC, using comfort, energy, cost, and peak demand metrics, complemented by ablation and disturbance-based stress tests. Results show that SACEM achieves a comfort score of 95.8%, while reducing energy consumption and operating cost by approximately 21% relative to the strongest baseline. The findings demonstrate that integrating comfort-dominant reward design with decision-time look-ahead yields robust, economically viable HVAC control suitable for deployment in hot-climate smart buildings.

Verified
Journal Article
Open access
PDF file
AAAhmed Abdelrhman Ahmed
Ahmed Abdelrhman Ahmed
MDMohamed Damos
Mohamed Damos
MEMuna Elsadig Mohamed Ahmed Elsheik
Muna Elsadig Mohamed Ahmed Elsheik
Abdolraheem KhaderAbdolraheem Khader
Abdolraheem Khader
Ali AhmedAli Ahmed
Ali Ahmed
AEAmmar Elhadi
Ammar Elhadi
Routing a medical-delivery UAV to multiple hospitals must jointly account for distance, flight time, payload, and clinical priority. We present a reproducible GIS-based framework for multi-stop UAV emergency medical routing in Khartoum State, Sudan, using a common obstacle-aware 3-D leg model with grid-based A* routing around no-fly zones and payload-dependent climb, cruise, and descent. We show that a linear priority term in a composite tour cost is order-invariant and cannot distinguish visiting sequences. We therefore use a priority-weighted completion-time objective with hard deadlines for Critical hospitals, with criterion weights derived from health professionals using the Analytic Hierarchy Process. On a 14-hospital network, exact Held–Karp and label-setting dynamic programming provide proven optima for benchmarking classical, metaheuristic, and Advantage Actor–Critic sequencing methods (A2C-SP). The revised objective reduces optimal priority-weighted completion time by 14% with only a 0.2% increase in distance. A2C-SP is 14.7% above the optimum across 47 unseen instances while generating routes in approximately 2 ms. Without retraining, it also plans capacity- and range-feasible multi-sortie missions on a 59-hospital city network, achieving a priority-weighted completion time of 110 min versus 137 min for the published toolbox route. At city scale, a single UAV cannot serve more than 5 of 16 Critical hospitals within 15 min, highlighting fleet sizing as a key constraint for meeting such deadlines.