Pingping Han

Prof. Pingping Han


Research Focus & Metrics

Academic Career Length

9Years (2018-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
6 June 2018 in Energies
Verified
Journal Article
Open access
PDF file
PHPingping Han
Pingping Han
ZLZihao Lin
Zihao Lin
LWLei Wang
Lei Wang
GFGuijun Fan
Guijun Fan
XZXiaoan Zhang
Xiaoan Zhang
Due to the huge data of large-scale photovoltaic (PV) power plants, the establishment of its equivalent model is more practical than a detailed model. In connection with the current research status, this paper reviews the steady-state equivalent model and transient equivalent model of PV power plants. The steady-state equivalent model is used for power flow calculation and static stability analysis. Transient equivalent models contain the single-machine equivalent model and the multi-machine equivalent models, which are used for the simulation analysis of large disturbances. The calculation of equivalent parameters and the equivalence of power collection system are briefly introduced. The conclusion and problems to be solved are put forward at the end. The establishment of the equivalent model simplifies the detailed model, which is convenient for the planning and simulation analysis of the PV power plant, and can also accurately characterize the operating characteristics of the PV power plant, which is of great significance.

16 May 2022 in IEEE Transactions on Power Delivery
Verified
Journal Article
Closed access
PHPingping Han
Pingping Han
QTQingyang Tong
Qingyang Tong
YWYan Wang
Yan Wang
ZCZhong Chen
Zhong Chen
WYWei Yang
Wei Yang
JZJingjing Zhang
Jingjing Zhang
The Ultra High Voltage (UHV) converter transformer may generate serious inrush current during closing. It will cause commutation voltage distortion and easily result in commutation failure of converters on the same commutation bus. Due to the change of flux amplitude and phase caused by closing resistance in the Ultra High Voltage Direct Current (UHVDC) system, it is difficult to determine the closing time of the converter transformer when considering the influence of residual flux. Therefore, this paper first analyses the existing closing resistance strategy, and constructs the magnetic bias function according to the influence characteristics of closing resistance on the flux and phase. Then an inrush current suppression strategy based on magnetic bias simulation is proposed for star connection and delta connection of UHV converter transformers, which can accurately calculate the ideal closing time of mutual cancellation between the residual flux and bias flux during closing. Finally, the no-load closing model of the UHV converter transformer is established by PSCAD/EMTDC for simulation analysis of the feasibility, real-time verification is carried out using the RTDS closed-loop experimental platform. The results show that the proposed inrush current suppression strategy can effectively suppress the inrush current under different residual flux conditions.

29 April 2019 in Processes
Verified
Journal Article
Open access
PDF file
PHPingping Han
Pingping Han
GFGuijun Fan
Guijun Fan
WSWeizhen Sun
Weizhen Sun
BSBolong Shi
Bolong Shi
XZXiaoan Zhang
Xiaoan Zhang
With the continuous increment of photovoltaic (PV) energy connection into a power grid, the accuracy of control parameters of PV power generation systems becomes the key to the stable operation of the power grid. At present, parameter identification based on an intelligent algorithm is a common means to obtain control parameters. However, most of the data used for identification are simulation data and the identified parameters are difficult to use in practical engineering. Therefore, aiming at the acquisition of low voltage ride through (LVRT) control parameters of PV unit, a method of identification of LVRT parameters of the PV unit is proposed, which combines sensitivity analysis with field measurement. In this paper, the test scheme of the required data is put forward through sensitivity analysis of the identified parameters, and the intelligent algorithm is used to identify the low voltage traverse parameters of the data. Finally, the optimal value is extracted from the identification results and substituted into the model. The accuracy of the parameter identification results is verified by calculating the error between the output of the model and the real operation data. The method considers the errors caused by different power levels of the inverters with highly accurate and consistent identification results, which is applicable to practical engineering calculation.

21 September 2018 in Energies
Verified
Journal Article
Open access
PDF file
JZJunjun Zhang
Junjun Zhang
YSYaojie Sun
Yaojie Sun
MLMeiyin Liu
Meiyin Liu
WDWei Dong
Wei Dong
PHPingping Han
Pingping Han
The model parameter identification based on real operation data is a means to accurately determine the simulation parameters of the microgrid, but the real operation data cannot guarantee the exact agreement with the required data for parameter identification, which has become an important restriction factor in the accurate simulation and analysis of the dynamics of the microgrid. This paper provides a method of modeling of microgrid based on data testing and parameter identification. In this paper, the method of parameter trajectory sensitivity is first introduced. Then, the data testing scheme for parameter identification is presented, and the parameter identification flow chart is given. Thirdly, a microgrid demonstration system in China is taken as an example, the important parameters of the distributed photovoltaic, direct-drive wind turbine and energy storage unit in the system are obtained by data testing and parameter identification, and in the end, the accuracy of the model is verified through the comparison of the simulation data and the test data of the microgrid during grid-connection/island switching process. The obtained microgrid model provides a base model for the analysis of the overall characteristics, such as the transient stability, as well as power quality of the microgrid.

15 March 2018 in Energies
Verified
Journal Article
Open access
PDF file
MDMing Ding
Ming Ding
YZYan Zhang
Yan Zhang
PHPingping Han
Pingping Han
YBYuying Bao
Yuying Bao
HZHaitian Zhang
Haitian Zhang
Large-scale wind-thermal-bundled power that is transmitted by mixed ultra-high voltage direct current (UHVDC)/ultra-high voltage alternating current (UHVAC) systems has become crucial for large-scale wind farms in China. Equations describing the electromagnetic power characteristics under short circuits for UHVAC lines and UHVDC blocks are derived based on an analysis of the external characteristics of a doubly fed wind farm and UHVDC systems. The effect of wind power penetration ratio on rotor angle transient stability is analysed, and the optimal wind power penetration ratio under the constraint of rotor angle transient stability is determined. The effects of system parameters, such as the UHVDC transmission capacity and the reactance of UHVAC lines on the optimal wind power penetration ratio are discussed. The trend of rotor angle stability varies from a monotonic deterioration to concave, and the optimal wind power penetration ratio increases from 0 to 30% under an UHVDC block when the reactance of UHVAC lines increases from 0.005 to 0.02. The optimal wind power penetration ratio under a short circuit increases from 40% to 60% when the reactance of UHVAC lines decreases from 0.02 to 0.006 and decreases from 40% to 30% when the capacity of UHVDC decreases from 3200 MW to 1600 MW. The analysis is verified by simulating an actual system in China’s Northwest Power Grid.

8 October 2026 in Electronics
Verified
Journal Article
Open access
PDF file
HZHuiming Zhang
Huiming Zhang
JLJincheng Liu
Jincheng Liu
PHPingping Han
Pingping Han
JWJie WU
Jie WU
To address the limitations of conventional black-start sources associated with geographical constraints and capacity configuration, a coordinated black-start control method was proposed for an islanded auxiliary-power microgrid of a biomass combined heat and power (CHP) plant, in which a diesel generator and a vehicle-to-grid (V2G) cluster operate cooperatively. First, a dynamic available-capacity assessment model was established for the V2G cluster. The diesel-generator capacity was then verified by considering the startup impacts of plant auxiliary motors, and the corresponding black-start restoration scheme was determined. Second, a coordinated control strategy for the diesel generator and V2G was developed. The diesel generator establishes the voltage and frequency references of the islanded microgrid through droop control, while local secondary frequency and voltage correction improves post-disturbance frequency and voltage recovery. The grid-following V2G cluster provides transient active-power support through primary frequency regulation and inertia-based frequency control. Finally, an electromagnetic transient model of the auxiliary-power microgrid of the biomass CHP plant was developed in PSCAD/EMTDC to simulate the sequential startup of mixed auxiliary motors. The results show that the improved diesel-generator control enhances the frequency and voltage recovery characteristics of the islanded microgrid. Fast active-power support from the V2G further suppresses frequency fluctuations caused by successive auxiliary-motor connections. The proposed coordinated strategy effectively improves the dynamic restoration performance of the black-start process.