Some construction projects in Indonesia have been experiencing frequent major delays, and there is an urgent need to perform a comprehensive schedule forecast to anticipate them. This study aims to enhance the forecast of the project-completion schedule of a major railway construction project in Indonesia, with considerations of the identified project risks. Using structured interviews of practitioners and experts, this study has identified key risks in the Phase II Construction project. The @RISK V8.5.1 software was used to run Monte Carlo Simulation to calculate the scheduling forecast more accurately with the PERT method. The results of the scheduling simulation on the inherent key risks that affect key activities in the critical path show that there are additional days due to pre-mitigation during the construction of the project, ranging from 130.81% to 136.25% of the initial contract completion duration to approximately 95.82% to 102.23% of the original contract completion duration. This research provides a way not only to identify and prioritize the risks but also to quantify them to estimate the project completion schedule more up to 95% accuracy using Monte Carlo Simulation, where the model can be used to plan and monitor the risks of future projects.

8 November 2024 in Journal Research of Social Science, Economics, and Management
Verified
Journal Article
Open access
PDF file
ASAnggi Sanjaya
Anggi Sanjaya
WIWisnu Isvara
Wisnu Isvara
The Indonesian government is actively pursuing infrastructure development, with railway projects being a key focus due to their high demand in Jakarta and its surrounding regions. However, the complexity of railway projects often leads to delays and numerous changes, resulting in scope modifications that necessitate change orders, which have negative consequences for the project. Managing these risks effectively is essential to mitigate their impact on project costs and performance. This study proposes a solution through the application of risk management using a qualitative method known as the Probability Impact Matrix, which helps assess the most significant risks leading to change orders. The research aims to identify and assess the risks responsible for contract change orders in the Double-Double Track Development Project. It uses a mixed-method approach, focusing on two main phases: risk identification and risk assessment. The study examines five risk factors, including project-related factors (X1), owner-related factors (X2), contractor-related factors (X3), design-related factors (X4), and external factors (X5). The results demonstrate that all five variables significantly influence changes in project scope, with risk levels ranging from moderate to high. These findings provide valuable insights for project owners, consultants, contractors, and other stakeholders involved in construction project management. The study serves as a reference for decision-making and the implementation of control measures to minimize the negative impact of change orders.

10 December 2024 in Journal Research of Social Science, Economics, and Management
Verified
Journal Article
Open access
PDF file
AWAndri Azhari Wicaksono
Andri Azhari Wicaksono
WIWisnu Isvara
Wisnu Isvara
This study analyzes the strategy for developing road infrastructure in Tamansari Village using a SWOT analysis approach. The purpose is to formulate an effective strategy to enhance social and economic growth in the village through improved infrastructure. This research adopts a descriptive qualitative method, involving primary data from interviews and observations and secondary data from various references. The findings reveal that Tamansari Village's road infrastructure development aims to optimize natural resource potential, enhance the local economy, and improve the quality of life for residents. Strengths include strong community participation and government support, while weaknesses include limited budgets and road maintenance issues. Opportunities such as economic growth and tourism development contrast with threats like policy changes and worker safety risks. The study concludes that addressing these challenges requires strategies including improved budget management, workforce training, socialization, and maintenance programs to ensure the sustainability and effectiveness of road development efforts. The results provide insights for policymakers and stakeholders in rural development initiatives.