Jean-Marc Frayret

Dr. Jean-Marc Frayret

orcid

Research Focus & Metrics

Academic Career Length

20Years (2007-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 December 2007 in International Journal of Flexible Manufacturing Systems
Verified
Journal Article
Closed access
PDF file
JFJean-Marc Frayret
Jean-Marc Frayret
SDS. D’aMours
S. D’aMours
ARA. Rousseau
A. Rousseau
SHS. Harvey
S. Harvey
JGJ. Gaudreault
J. Gaudreault

7 November 2023 in Computers & Industrial Engineering
Verified
Journal Article
Closed access
MKMahboobe Kheirabadi
Mahboobe Kheirabadi
SKSamira Keivanpour
Samira Keivanpour
YCYuvin Chinniah
Yuvin Chinniah
JFJean-Marc Frayret
Jean-Marc Frayret

3 July 2023 in Journal of Industrial Ecology
Verified
Journal Article
Closed access
JWJulien Walzberg
Julien Walzberg
JFJean-Marc Frayret
Jean-Marc Frayret
AEAnnika L. Eberle
Annika L. Eberle
ACAlberta Carpenter
Alberta Carpenter
GHGarvin Heath
Garvin Heath

1 March 2016 in Journal of Cleaner Production
Verified
Journal Article
Closed access
MGMohamed Raouf Ghali
Mohamed Raouf Ghali
JFJean-Marc Frayret
Jean-Marc Frayret
JRJean-Marc Robert
Jean-Marc Robert

17 August 2009 in International Journal of Production Research
Verified
Journal Article
Closed access
FYF. Cid Yáñez
F. Cid Yáñez
JFJean-Marc Frayret
Jean-Marc Frayret
FLF. Léger
F. Léger
ARA. Rousseau
A. Rousseau
This paper addresses the generic problem of production planning in a divergent timber production environment. It aims at analysing the performance of various demand-driven production strategies of a timber production system. This analysis is performed using a simulation platform built on an agent-based advanced planning system. Nine production strategies configurations are evaluated under six scenarios in order to carry out a complete mixed level design of 54 simulation runs. Each of these configurations is a combination of a decoupling point position and a level of capacity that is committed to contracts with customers. Accordingly, the six scenarios are designed as a combination of supply type (i.e. log diameter distribution) and timber market prices. Production processes and co-production yields are based on a real manufacturing system from eastern Canada. Performance is evaluated from the logistic and economic points of view. Results demonstrate that demand-driven planning approaches that propagate demand information upstream the supply chain have the potential to improve planned customer service and reduce planned inventories. Results also show that timber companies need to receive a premium from their customers in order to compensate from the loss of potential value resulting from a more constrained planning environment.

22 February 2016 in Journal of Industrial Ecology
Verified
Journal Article
Closed access
PDF file
MMMartin Maillé
Martin Maillé
JFJean-Marc Frayret
Jean-Marc Frayret