Construction projects are increasingly characterized by uncertainty, interdependence, organizational fragmentation, technological integration, and evolving interactions that challenge the assumptions of traditional linear project management approaches. This study provides a systematic and integrative understanding of complexity in construction project management by identifying its principal dimensions, dynamic behaviors, management approaches, and implications for project performance. A systematic literature review was conducted and reported in accordance with the PRISMA 2020 guidelines, using Scopus as the primary bibliographic database and a supplementary literature update, resulting in a final evidence base of 136 unique sources. Descriptive and bibliometric analyses were complemented by a qualitative synthesis of the reviewed literature. The findings indicate that construction project complexity can be interpreted through five interconnected dimensions: structural, organizational, technological, contextual, and dynamic complexity. Dynamic project behavior is particularly associated with feedback loops, time delays, non-linear relationships, emergence, and evolving interactions among project components. The review further indicates that complexity does not determine project performance independently; rather, outcomes emerge from the interaction between project complexity, dynamic system behavior, and the managerial capacity to coordinate, interpret, and adapt to changing conditions. Lean-oriented approaches, systems thinking, System Dynamics, socio-technical perspectives, governance mechanisms, BIM, and simulation-based approaches provide complementary mechanisms for addressing different aspects of complexity. Based on these findings, an integrative framework is proposed linking project complexity, dynamic project behavior, management approaches and organizational capabilities, and project performance through recursive feedback relationships. The study concludes that complexity should be treated as an inherent characteristic of construction project systems and managed through systemic, adaptive, and integrative approaches rather than through simplification or deterministic control alone.