High mountain areas are prone to extreme hydrological events, and their study is especially important in the context of ongoing intensive deglaciation. In this research, a model “chain” consisting of a hydrodynamic model and a runoff formation model is adopted to simulate a glacier lake outburst flood (GLOF) from Bashkara Lake (the Central Caucasus, Russia) and its effect on downstream. In addition to an actual GLOF event that occurred on 1 September 2017 and led to casualties and significant destruction in the Adylsu and Baksan Rivers valleys, possible scenarios for the re-outburst of the lake are considered. The hydrographs of the outburst and the downstream movement of the flood wave along the Adylsu River valley are estimated using STREAM_2D two-dimensional hydrodynamic model. The water discharges in the entire river network of the Baksan River are assessed using the ECOMAG (ECOlogical Model for Applied Geophysics) runoff formation model. The output flood hydrograph from the hydrodynamic model is set as additional input into the Baksan River runoff formation model in the upper reaches of the Adylsu River. As a result of the simulations, estimates for the contribution of GLOFs and precipitation to an increase in peak discharge along the Baksan River were obtained. The actual outburst flood contributed 45% and precipitation 30% to the peak flow in the Baksan River at the mouth of the Adylsu River (10 km from the outburst site). In Tyrnyauz (40 km from the outburst site), the contributions of the outburst flood and precipitation were equal and, in Zayukovo (70 km from the outburst site), the outburst flood contributed only 20% to the peak flow, whereas precipitation contributed 44%. Similar calculations were made for future potential re-outburst flood, taking into account climatic changes with an increase in air temperatures of 2 °C, an increase in precipitation of 10% in winter and a decrease of 10% in summer. The maximum discharge of the re-outburst flood in the Adylsu River mouth, according to model estimations, will be approximately three times less than the discharge of the actual outburst on 1 September 2017 and can contribute up to 18% of the peak discharge in the Baksan River at the confluence.
Results of flood modelling for three cities located in different parts of Russia: (1) Veliky Ustyug at the Northern Dvina river (Europe); (2) Mezhdurechensk at the Tom river (Siberia); and (3) Blagoveschensk at the Amur river (Far East) are presented. The two-dimensional hydrodynamic model of flow in channels and on floodplain STREAM_2D on the basis of the numerical solution of two-dimensional Saint–Venant equations on a hybrid curvilinear quadrangular and rectangular mesh was used for the simulations. Verification of the model through a comparison of simulated inundated areas with outlines of flooded zones from satellite images for known hydrologic situations demonstrate close correspondence (relative errors of 7–12% in terms of the area for peaks of the analysed floods). Analyses of embankment influence of large-scale levees on the water flow demonstrate that, in some cases, water levels could rise by more than 1 m and the patterns of the flooding zones could significantly differ.
The article presents the results of adaptation and application of two-dimensional hydrodynamic model STREAM_2D to reproduce the characteristics of ice-jam-induced floods in the vicinity of the city of Velikiy Ustyug (the Northern Dvina river basin, Vologda region, Russia). The additional hydraulic resistance due to ice roughness and the decrease in the flow cross-section area due to ice-caused congestion were taken into account for modeling of ice-jam-induced water level variations. The corresponding model parameters were estimated on the basis of numerical experiments and flood modeling for the period from 1980 to 2016, which includes more than 18 significant cases of ice-jamming. Grouping of model parameters by the height of the ice-jam-induced water level rises could be useful for the application of the developed model in the framework of an intelligent information system of river flood monitoring.
This article gives the results of developing and testing a system for operational river flood forecasting, which is based on a system of hydrological and hydrodynamic models, as well as...
Water flow and sediment transport under the effect of hydrotechnical constructions on the Amur River near Blagoveshchensk and Heihe cities was analyzed based on two-dimensional hydrodynamic modeling...