Hyunseok Kwak

Mr. Hyunseok Kwak


Research Focus & Metrics

Academic Career Length

2Years (2025-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
19 November 2025 in Buildings
Verified
Journal Article
Open access
PDF file
DKDae-Young Kim
Dae-Young Kim
RKRyang Gyun Kim
Ryang Gyun Kim
HKHyunseok Kwak
Hyunseok Kwak
Prefabricated construction has emerged as a key strategy to enhance productivity and quality in infrastructure projects. Yet, construction scheduling for prefabricated infrastructure projects often suffers from persistent discrepancies between planned and actual performance due to static assumptions of task durations and fragmented management methods. To address this challenge, this study proposes a closed-loop framework that integrates probabilistic estimation, prescriptive planning, and performance feedback for prefabricated girder bridge construction. Standard task time (ST) is dynamically modeled using Bayesian regression, which incorporates prior knowledge and updates continuously with new field data. The updated ST distributions are embedded into a time–cost trade-off (TCTO) optimization algorithm to generate resource-constrained schedules. Execution data are captured through an object-based digital logging system, and performance is evaluated using the Schedule Performance Index (SPI). The accumulated results are then used to update the Bayesian model, creating a self-correcting cycle of plan → execution → performance → updating. Using eleven prefabricated girder projects, we standardized task definitions and quantified the plan and actual gaps that motivate the framework. Six projects formed the training set for Bayesian regression to estimate ST with priors; four projects were scheduled with TCTO using the posterior ST, and execution outcomes were compared with the generated plans to validate accuracy, while the collected evidence was used to update the Bayesian model; one final project received the full closed-loop application for comparative assessment of plan versus outcome, with SPI used in the closed-loop evaluation. The deployments improved alignment between plan and actual, narrowed uncertainty in ST over time, and supported credible schedules, real time progress visibility, and resource efficient planning in repetitive prefabrication. From a managerial perspective, the implemented system operationalizes feedback between planning and execution with configurable update cadences such as daily logs, repetitive unit cycles, and project close out. This study provides a validated and extensible template for closed-loop schedule management in prefabricated settings and clarifies the novelty of unifying Bayesian estimation, TCTO optimization, and digital performance feedback in one practical workflow.

2 September 2025 in Buildings
Verified
Journal Article
Open access
PDF file
SYSeokjoon You
Seokjoon You
HJHyon Wook Ji
Hyon Wook Ji
HKHyunseok Kwak
Hyunseok Kwak
TCTaewon Chung
Taewon Chung
MBMoongyo Bae
Moongyo Bae
Modern construction and infrastructure projects produce large volumes of heterogeneous data, including building information models, JSON sensor streams, and maintenance logs. Ensuring interoperability and data integrity across diverse software platforms requires standardized data exchange methods. However, traditional neutral object models, often constrained by rigid and incompatible schemas, are ill-suited to accommodate the heterogeneity and long-term nature of such data. Addressing this challenge, the study proposes a schema-less data exchange approach that improves flexibility in representing and interpreting infrastructure information. The method uses dynamic JSON-based objects, with infrastructure model definitions serving as semantic guidelines rather than rigid templates. Rule-based reasoning and dictionary-guided term mapping are employed to infer entity types from semi-structured data without enforcing prior schema conformance. Experimental evaluation across four datasets demonstrated exact entity-type match rates ranging from 61.4% to 76.5%, with overall success rates—including supertypes and ties—reaching up to 95.0% when weighted accuracy metrics were applied. Compared to a previous baseline, the method showed a notable improvement in exact matches while maintaining overall performance. These results confirm the feasibility of schema-less inference using domain dictionaries and indicate that incorporating schema-derived constraints could further improve accuracy and applicability in real-world infrastructure data environments.