In order to reduce the heat and mass transfers in buildings, which increase energy bills, the development of composites materials such as earth bricks stabilized with thatch fibers is important for their construction. This paper aims to study a one-dimensional model of heat and moisture transfer through porous building materials. The coupled phenomena of heat and mass transfer are described by the Luikov model. Equations and boundary conditions are discretized using the finite difference method. The results obtained illustrate the temporal evolutions of the temperature and the moisture content, as well as the distributions of the temperature and moisture content inside the wall. The profile of the temperature and water content that are obtained are compared with the other numerical solutions that are available in the literature.
15 May 2023 in Control Systems and Optimization Letters
This paper proposes a cost-effective solution through a recompletion design of sand control to restart the production of a dead well named "X" (for confidential reasons). The data used to achieve the objective of this paper are the production parameters, reservoir properties and the previous completion design. The tool used to draw the new completion schematic is Power Drawn software. It is necessary to use two softwares (PowerDrawn and Pipesim), Ishikawa method and economic evaluation method. The different causes that probably contributed to the production stop in well X are given by using the Ishikawa diagram. The top sediment is obtained by using the sonic log and the clean-up is performed by using coiled tubing with a drill bit incorporated at the end. The mechanical packer is installed to isolate the formation, the pre-packed screen allows the filtration of hydrocarbons. The on-off tool ensures the installation of the mechanical packer and the minimum restriction for the passage of the equipment through the ones in place is 2.313 inches. After the installation of the recompletion, a positive return on investment is obtained and after a production time of one week. The financial aspect after installation of the recompletion shows that a recompletion of the sand control at lower cost is achieved.