Numerous fast-growing coastal cities in the Global South are exposed to coastal, fluvial and pluvial floods, as a consequence of decades-long rapid urbanisation and weak enforcement of planning regulations. Integrating Blue–Green Infrastructure (BGI) concepts into the development of the urban landscape has the potential to increase flood resilience and offer broader environmental benefits. BGI is an innovative approach that combines water management and green infrastructure to maintain natural water cycles and enhance environmental and urban renewal. This paper identifies socio-economic, cultural and political challenges influencing BGI adoption in Semarang city in Indonesia. Data was collected from residents of three communities through interviews (n=30), questionnaires (n=180) and focus groups with policymakers and community representatives. The combined quantitative and qualitative data provide an understanding of the specific socio-economic, cultural and political issues at play and reveal flood experience as well as perceptions of community members regarding flood management. Challenges are presented from the point of view of residents and local policymakers and are based on a framework for facilitating local BGI adoption, setting the principles of “inclusive”, “appropriate” and “proactive” as pre-conditions for enhancing community resilience to flooding.
1 January 2010 in Construction Management and Economics
Construction supply chains encompass the flows of materials, labour, information, plant, equipment and temporary works that originate from a variety of different parties. The impact of various supply chain management practices on project performance has been measured, through a combination of a survey and the development of simulation models. Preliminary investigations were carried out by visiting two medium‐sized building projects regularly over a period of six months to gain an understanding of the ways in which delays on supply chains impact on project performance. This was followed by the main survey which was designed to collect data required for developing the simulation models. These models were developed using Pertmaster Risk Expert™ software and incorporated supply chain delays applied to a CPM network of a typical medium‐sized building project of 300 days’ duration. The results of the simulation showed that the project’s median delay was 67 days (22% of the project duration). The use of subcontractors in the project reduced this delay by approximately 45%. It was also learned that delays in material flow caused the biggest impact on the project, followed by labour flow, information flow and ‘plant, equipment and temporary work’ flow. These findings are an important measure of how much supply chain delays impact on project performance.
The development of information technology continues to evolve to respond the increasing demand and challenges in the construction industry. Building Information Modelling (BIM) emerges in recent years as the fresh solution to make the project lifecycle more efficient by encouraging collaborative working of all stakeholders involved in the construction project, i.e. owners, consultants, and contractors. This study aims to investigate BIM adoption and implementation in Indonesia construction industry and explore challenges and opportunities related to the implementation of BIM. A combination of qualitative and quantitative research method has been adopted for this exploratory research. Data was collected through interviews and questionnaires survey with snowball sampling from twenty entities, consisting of 12 contractors, 4 consultants, and 4 owners. The results show that 60% of respondents have already acknowledged and implemented BIM. The examples of BIM software used by the respondents include Revit, Tekla, and SmartPlan®. Benefits of BIM implementation as perceived by most respondents, e.g. design collision detection, clear project simulation, reduced reworks, and efficient use of resources. The adoption of BIM, however, still faces challenges, such as the absence of requirement and demand, and high investment cost. This research provides an initial understanding of current BIM adoption in Indonesia, which can be used as the basis to develop a national strategic framework for BIM adoption in Indonesia construction industry.
18 April 2017 in IPTEK Journal of Proceedings Series
While the need for water supply infrastructure development keeps increasing, many local governments of Indonesia are facing problems related to limited funding. This condition opens up an opportunity for private sector to invest in water supply infrastructure projects through Public Private Partnership (PPP) scheme. As this scheme is relatively new for many local governments in Indonesia, its complexity and typically long duration of the concession period may raise concerns of potential risks throughout the project life cycle. It is, therefore, very important for public sector as owner of the project to understand and to be able to manage risks properly throughout the concession period. The aim of this research is to evaluate risk management of West Semarang Water Supply PPP Project as perceived by public sector. The objectives are to identify, to analyze, and to allocate risks to the right parties. Qualitative and quantitative approaches have been used for the research method. Data were collected through focus group discussion involving 16 relevant officials of local government of Semarang, including its Regional Water Supply Company (PDAM). This research has identified a total of 66 risks as perceived by the public sector, which are then classified into 11 categories, e.g. political, operation, revenue, etc. The proportions of the level of risks are relatively balanced, as follows; low (37.88%), moderate (28.79%) and high (33.33%). In terms of risk allocation, 46.97% of risks are allocated to the public sector, while 37.88% and 15.15% of the risks are allocated to the private sector and shared by both parties, respectively. The results of this research are valuable for the local government of Semarang and can be used as a guidance in managing risks of the PPP project throughout the concession period.
High rainfall leads to flood vulnerability and potentially leads to the failure of road pavement which affects the economic loss for the people. However, such road pavement failures need to be studied more deeply to be able to distinguish whether the failure is solely due to flood natural disaster or other factors, such as overloading and poor construction quality. This research is urgently needed because up to now there is no tool for assessing pavement failure as a tool of decision-making system that is able to distinguish road pavement failure causal factors into category of natural disaster or human negligence factors in accordance with the definition of building failure in Indonesia Law no. 2 year 2017. Assessment of the causal factor of failure is very important because it is closely related to the determination of the parties who must be legally responsible. This research intends to develop methods for assessing the damage and failure of pavement as a tool of rapid and accurate decision-making system to determine the factors of pavement failure. To obtain accurate results, a case study was taken on Kendal Timur road to enable a deep evaluation of the factors that causing failure on the road. The results showed that many factors involved in causing the failure of the road, such as un-functional drainage channel, uncontrolled overload due to the closing of weigh stations around the road, and also low quality of road maintenance work so that repeating similar road damages occurred in the not-too-distant future. Based on functional and structural failure analysis, as much as 71%, 10% and 19% of the road were in failed, critical and not-failed conditions, respectively.
Over the last few decades, flood hazards have had a greater impact on society, meaning that communities increasingly need to work together to enhance their resilience. Literature suggests that preparedness to flooding events is generally low as most individuals do not take protective actions. Therefore, there is a need to stimulate individuals’ actions that increase their own and their communities’ resilience to flooding. Various factors must be addressed to encourage individuals to take action, such as providing information to improve risk perception, understanding cognitive processes that interpret environmental stimuli against the mental model, and considering social and cultural influences. This paper argues that Social Responsibility (SR), defined as an individual willingness to take up actions that benefit society, is part of a pre-existing mental model that can explain intentions to take preparedness actions that improve community resilience. Due to differing socio-cultural contexts, the SR perceptions of communities in different parts of the world may differ. In order to investigate this phenomenon, data of SR perceptions obtained from 180 completed questionnaires were collected from flooded and non-flooded communities in Semarang, Indonesia, and then compared against those obtained from 313 questionnaires based on a survey of communities in Birmingham and London in the UK. The results suggest that Indonesian communities demonstrate a higher level of SR scores than UK communities. A comparison of SR scores between flooded and non-flooded communities in the UK shows a higher level of SR in flooded communities. In contrast, the comparison between corresponding Indonesian communities indicates an almost similar level of SR. A comparison of SR scores between Indonesian and UK flooded communities shows a higher level of SR in Indonesian communities across several measures. Further comparison of SR scores between Indonesia and UK non-flooded communities demonstrates higher SR in Indonesian communities in all but one measure. This suggests that experience of flooding has a much stronger influence on raising SR perceptions in UK communities. Socio-cultural background may explain these differences in SR perceptions, particularly, in relation to collectivism orientation and the close-knit nature of Indonesian communities. Although higher SR perceptions do not necessarily mean higher levels of preparedness actions, this finding illuminates the important influence of socio-cultural context on community resilience enhancing efforts that rely on collective actions by individuals.