Gao Lei

Dr. Gao Lei


Research Focus & Metrics

Academic Career Length

9Years (2018-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
19 July 2018 in Sustainability
Verified
Journal Article
Open access
PDF file
GLGao Lei
Gao Lei
ZZZhenYu Zhao
ZhenYu Zhao
The public-private-partnership (PPP) is a new mode for the government and social capital to jointly invest in public infrastructure projects. In particular, PPP projects for new energy power construction have been strongly supported in some countries in recent years, because it can not only reduce financial pressure on the government, but also promote the development of new energy. Current scholars study the economic benefits of PPP projects for new energy power construction from a macro perspective, and they rarely study behavioral strategies of the government and social capital as a game process of project construction from a micro perspective. This paper will fill this gap. This study firstly built an evolutionary game model of the government and investors based on new energy power construction PPP projects. Secondly, taking China’s typical new energy power construction PPP project–waste incineration power generation as an example, the system dynamics (SD) model was proposed to simulate the evolutionary process of game players’ behavioral strategies. Finally, the effects of key factors in the construction of PPP project on the strategies’ stability were studied. The results show that: (1) there is no evolutionarily stable strategy (ESS) in the game system between the government and investors, and system evolution is characterized by periodic behavior. (2) When the government implements dynamic bounty measures, the system evolution process is still a closed loop with periodic motion. However, when the government implements dynamic punishment measures, there is a stable ESS in the hybrid strategy of the game system. (3) The government can increase unit fines when making dynamic strategic adjustments, which will not only promote the active cooperation of investors, but also reduce the probability of government supervision, thereby reducing costs.

2 February 2020 in Sustainability
Verified
Journal Article
Open access
PDF file
GLGao Lei
Gao Lei
ZZZhenYu Zhao
ZhenYu Zhao
The government, investors, and the public have formed a dynamic multi-game relationship on the Public-Private-Partnership (PPP) project, but few studies include them in a system to study their win–win solutions. Firstly, we constructed a tripartite game model of the government, investors, and the public based on evolutionary game theory. Secondly, the evolutionary process of tripartite strategy behaviors was studied with the system dynamics (SD) model. Finally, the impact of changes in key factors on behavior strategies was studied through sensitivity analysis. The results show the following: (1) In the outsourcing of new energy and power construction PPP projects, the three parties will eventually reach the equilibrium state of {government supervision, public participation, investors effort}, the three parties achieve a win–win situation and the project benefits are the highest at this time, and the public participation will play an important role in promoting the smooth outsourcing of PPP projects. (2) The strategic choices of the government, investors, and the public are sensitive to changes in the corresponding exogenous variables. (3) The security factor plays a crucial role in the choice of public strategy. The public’s choice is not only affected by its own income and cost, but also by the amount of compensation promised by the government and the estimated damage caused by the investor.