Aknur Zhidebekkyzy

Dr. Aknur Zhidebekkyzy


Research Focus & Metrics

Academic Career Length

12Years (2015-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 September 2020 in Economics & Sociology
Verified
Journal Article
Closed access
RKRuslan Kostiukevych
Ruslan Kostiukevych
HMHalyna Mishchuk
Halyna Mishchuk
AZAknur Zhidebekkyzy
Aknur Zhidebekkyzy
JNJoanna Nakonieczny
Joanna Nakonieczny
Oleksandr AkimovOleksandr Akimov
Oleksandr Akimov

1 June 2020 in Polish Journal of Management Studies
Verified
Journal Article
Closed access
Aisulu MoldabekovaAisulu Moldabekova
Aisulu Moldabekova
AZAknur Zhidebekkyzy
Aknur Zhidebekkyzy
EBElmira Baimukhanbetova
Elmira Baimukhanbetova
SASandigul Akhmetkaliyeva
Sandigul Akhmetkaliyeva

18 December 2024 in Knowledge and Performance Management
Verified
Journal Article
Open access
PDF file
AKAssel Kosherbaevna Kozhakhmetova
Assel Kosherbaevna Kozhakhmetova
AMAlmas Mamyrbayev
Almas Mamyrbayev
AZAknur Zhidebekkyzy
Aknur Zhidebekkyzy
SBSvitlana Bilan
Svitlana Bilan
The study explores the impact of artificial intelligence (AI) technologies on project management (PM) across different industries. It aims to assess how AI adoption in PM affects project efficiency. The study surveyed 159 project supervisors and specific project managers implementing projects from 7 industries in the Republic of Kazakhstan: software, green energy, engineering, construction, science, transport, and tourism. The research used variance and linear regression analyses to evaluate the relationship between AI adoption and project efficiency level measured by the Likert scale from 1 to 5 and test the associated hypotheses. The results show that AI adoption varies among industries, with software, construction, and scientific projects being the most active users. The study also found that the use of AI differed across eight project performance domains, with the stakeholder domain using voice technologies and process automation and the uncertainty domain using fewer tools. Projects with higher AI adoption rates showed higher efficiency scores (for example, in Software projects, the AI adoption rate is 3.2; the efficiency rate is 3.3), while those with lower efficiency levels (for example, in the Tourism industry, the AI adoption rate is 1.9; the efficiency rate is 2.2) showed the worst results. Decision-making systems, process automation, and voice technologies are the three most critical AI technologies PM professionals use to improve project efficiency. Acknowledgments This research has been funded by the Committee of Science of the Ministry of Science and Higher Education of the Republic of Kazakhstan (Grant No. AP19680313).

15 September 2019 in MONTENEGRIN JOURNAL OF ECONOMICS
Verified
Journal Article
Closed access
AZAknur Zhidebekkyzy
Aknur Zhidebekkyzy

1 March 2020 in Journal of International Studies
Verified
Journal Article
Open access
GSGaliya Sansyzbayeva
Galiya Sansyzbayeva
ZTZhansaya Temerbulatova
Zhansaya Temerbulatova
AZAknur Zhidebekkyzy
Aknur Zhidebekkyzy
LALaura Ashirbekova
Laura Ashirbekova

1 June 2019 in Economics & Sociology
Verified
Journal Article
Open access
AKAssel Kozhakhmetova
Assel Kozhakhmetova
AZAknur Zhidebekkyzy
Aknur Zhidebekkyzy
ATArdak Turginbayeva
Ardak Turginbayeva
ZAZauresh Akhmetova
Zauresh Akhmetova