Jiapeng SHI

Mr. Jiapeng SHI

orcid

Research Focus & Metrics

Academic Career Length

2Years (2025-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
18 January 2025 in Applied Sciences
Verified
Journal Article
Open access
PDF file
JSJiapeng SHI
Jiapeng SHI
Yu TaoYu Tao
Yu Tao
QXQingyun Xu
Qingyun Xu
JDJie Dai
Jie Dai
JDJin Di
Jin Di
Fengjiang QinFengjiang Qin
Fengjiang Qin
The increasing use of cable-stayed bridges with steel box girders necessitates more sophisticated design approaches, as the diverse environments of bridge locations place higher demands on the design process. Determining a reasonable finished state is a critical aspect of bridge design, yet the current methods are significantly constrained. A new approach to optimizing the finished state is proposed. This method’s practicality and efficiency are verified through a case study, analyzing how constraints on vertical girder deflection, horizontal pylon displacement, cable forces, and cable force uniformity affect the optimization outcome. The results show that convergence of the mixed-constraint quadratic programming model is achieved within 30 iterations, yielding an optimized finished state that meets the design criteria. The chosen constraint ranges are deemed appropriate, and the optimization method for the construction stage is thus demonstrably feasible and efficient. The multiplier path following optimization algorithm is computationally efficient, exhibiting good convergence and insensitivity to the problem size. Being easy to program, it avoids the arbitrariness of manual cable adjustment, enabling straightforward determination of a reasonable finished state for the cable-stayed bridge with a steel box girder. The vertical displacement of the main girder, the positive and negative bending moments, and the normal stresses at the top and bottom edges, as well as the positive and negative bending moments in the towers, are significantly influenced by the constraint ranges. The horizontal displacement of the pylon roof is significantly affected by the constraint ranges of both the main girder’s vertical displacement and the pylon’s horizontal displacement, while the remaining constraint ranges have a limited impact.

29 August 2025 in Applied Sciences
Verified
Journal Article
Open access
PDF file
YSYanguo Sun
Yanguo Sun
TZTianyi Zhang
Tianyi Zhang
Mingshui LiMingshui Li
Mingshui Li
JSJiapeng SHI
Jiapeng SHI
YSYi Su
Yi Su
RSRui Sun
Rui Sun
A significant aerodynamic interference effect exists between parallel bridges. In this study, a proposed long-span cable-stayed bridge, near which is an existing truss-arch bridge, was considered as the background. The wind characteristics at the proposed bridge site and the wind-induced responses of the bridge deck were investigated with and without the influence of an upstream bridge. The results showed that under aerodynamic interference of the upstream bridge, the downstream bridge site exhibited a noticeable change in the mean wind speed profile within the height range of the main girder and arch. The turbulence intensities significantly increased, especially for u and w components. The integral scales decreased remarkably, and the wind speed spectra redistributed toward higher frequencies. For the wind-induced responses, the mean displacements of the downstream bridge all decreased; in contrast, the buffeting and peak displacements all increased in both the maximum single cantilever state and the completed state, while the variation in buffeting response was much more significant and dominated the peak response. Moreover, under the interference of the upstream bridge, the buffeting displacement spectra redistributed toward high frequencies. This research acts as an effective tool for achieving secure bridge design and finding a better balance between design constraints.