Simulation modelling is applied to a wide range of problems, including defence and healthcare. However, there is a concern within the simulation community that there is a limited use and implementation of simulation studies in practice. This suggests that despite its benefits, simulation may not be reaching its potential in making a real-world impact. The main reason for this could be that simulation tools are not widely accessible in industry. In this paper, we investigate the issues that affect simulation modelling accessibility through a workshop with simulation practitioners. We use Strategic Options Development and Analysis (SODA), a problem-structuring approach that allows for the stakeholder views to be expressed and linked in a systematic way. The causal map derived represents the emerging concepts and their effects, with the view to identifying their impact on the accessibility problem. We present our analysis of the issues and options identified. Based on our findings, we discuss the implications and recommendations for the future uptake of simulation.
The construction industry is critically reliant on efficient supply chains to ensure better project management, success, and profitability. This research examined the critical and ongoing challenges within the construction supply chain, with a particular emphasis on the persistent shortage of truck drivers and its far-reaching implications for construction logistics. Utilizing a structured multi-phase approach, the research integrated a comprehensive literature review, bibliometric analysis, and an empirical case study involving commercial motor vehicle (CMV) drivers. The literature review established the current state of knowledge on transportation labor shortages. At the same time, the bibliometric analysis revealed four key thematic clusters that collectively define the primary areas influencing construction supply chain performance. The case study reinforced these findings by highlighting key factors contributing to driver shortages, including demographic shifts, challenging working conditions, regulatory barriers, and geopolitical disruptions. The paper concludes with practical implications for industry practitioners, policymakers, and supply chain managers, emphasizing the necessity of integrative operational and strategic responses to build resilient and sustainable construction supply chains and logistics systems, with a specific focus on truck driver shortages. By examining both academic literature and field-based perspectives, this research provides a comprehensive understanding of how labor shortages, particularly in transportation, can destabilize construction supply chains and identifies the most effective measures to support their foundations.
Purpose: This paper aims to develop a performance-based safety modification rate (SMR) framework designed to address selected structural limitations associated with using the experience modification rating (EMR) alone for offsite safety-performance assessment. The framework integrates phase-sensitive leading and lagging indicators across fabrication, transportation and assembly within a multidimensional relative-benchmarking structure. Design/methodology/approach: The study develops a data envelopment analysis (DEA)-based benchmarking framework using 36 expert-prioritized leading and lagging safety indicators identified through a structured literature review and an expert survey of offsite contractors and insurance professionals. A simulated dataset is used to examine model computational workflow, comparative efficiency benchmarking, pattern classification and diagnostic gap assessment. Multicollinearity and dimensionality checks are performed to examine the analytical structure of the illustrative model. Findings: The simulation illustrates how the DEA-based SMR differentiates simulated firm-year profiles based on multidimensional safety performance, establishes a common ideal-referenced safety benchmark, and classifies firms into distinct descriptive performance trajectories. Through its design, the framework represents proactive safety practices and phase-specific operational conditions that are not explicitly captured when EMR is used alone. Research limitations/implications: The model is demonstrated using simulated data due to limited availability of consolidated, multi-year offsite safety datasets. Also, the simulated yearly trajectories are descriptive illustrations and do not constitute statistical longitudinal inference. Future research should validate the SMR using real-world industry data. Practical implications: The SMR provides insurance carriers and offsite contractors with a structured framework for benchmarking multidimensional safety performance, prioritizing safety review, and examining phase-specific performance patterns. It also establishes a structured foundation for integrating proactive safety information into workers’ compensation underwriting and loss-control processes. Originality/value: The study operationalizes an expert-prioritized, leading and lagging set of offsite construction safety indicators within a DEA framework and demonstrates how the resulting scores may support relative benchmarking and performance classification to support insurance decisions.
1 November 2026 in Journal of Management in Engineering
Cost overruns and estimation instability persist in construction projects despite sustained advances in cost estimation models and digital tools. In offsite construction, these challenges are intensified by early design freeze, distributed production, and tightly coupled supply chains. Yet, cost estimation research continues to treat uncertainty primarily as a technical or computational problem. This study examines cost estimation in offsite construction from a sociotechnical and organizational behavior perspective. A multilayered review methodology was employed, combining bibliometric analysis of 526 Scopus-indexed publications, a systematic literature review of 57 core studies, and qualitative synthesis of explanatory evidence. Bibliometric mapping was used to identify dominant research themes, followed by an in-depth analysis of studies explicitly linking organizational behavior to cost estimation and cost-related performance. The results identified five recurring organizational behavior mechanisms influencing estimation reliability in offsite construction: information quality and stability, coordination efficiency, decision behavior and bias, risk sensing and response capacity, and learning and calibration. Based on these findings, a sociotechnical conceptual framework is synthesized from the reviewed evidence to illustrate how organizational behavior shapes estimation processes and cost outcomes. The study concludes that cost estimation in offsite construction is best understood as an organizational capability embedded within broader sociotechnical systems, with implications for future research and the development of forecasting and decision-support tools.