Advancements in robotics and computer vision are transforming how infrastructure is monitored and maintained. This paper presents a novel, fully automated pipeline for pavement condition assessment that integrates real-time image analysis with PCI (Pavement Condition Index) computation, which is specifically designed for deployment on mobile and robotic platforms. Unlike traditional methods that rely on costly equipment or manual input, the proposed system uses deep learning-based object detection and ensemble segmentation to identify and measure multiple types of road distress directly from 2D imagery, including surface weathering, a key precursor to pothole formation often overlooked in previous studies. Depth estimation is achieved using a monocular diffusion model, enabling volumetric assessment without specialized sensors. Validated on real-world footage captured by a smartphone, the pipeline demonstrated reliable performance across detection, measurement, and scoring stages. Its potential hardware-agnostic design and modular architecture position it as a practical solution for autonomous inspection by drones or ground robots in future smart infrastructure systems.
13 April 2026 in Innovative Infrastructure Solutions
This study focuses on the application of FIDIC Conditions of Contract for EPC Turnkey Projects—Silver Book 1999, (FIDIC (EPC&T)), when governed by the Egyptian Law of Contracts concluded by public bodies No. 182 of 2018 (ELC) due to the conflicts that may arise from such application. Hence, this study identifies specific FIDIC (EPC&T) 1999 clauses that have the potential for conflicts with ELC, shows the similarities and disparities between these clauses and the relevant ELC articles, and provides recommendations to ensure the successful application of FIDIC (EPC&T) 1999 under ELC. This was achieved through a multistep research methodology in which a survey was undertaken to explore the perspectives of a selected group of construction contracts’ experts about the conflicting clauses of FIDIC (EPC&T) 1999 with ELC’s articles. Next, based on the survey results, the clauses related to delay damages, adjustment for changes in cost, and contract termination were analyzed under the ELC articles and, consequently, some amendments are recommended for some of these FIDIC (EPC&T) 1999 clauses to make them more suitable for use under ELC. Accordingly, through applying these amendments, this study will contribute to the wider application of FIDIC (EPC&T) 1999 in Egypt as it helps in reducing the possibilities of legal conflicts and enhances the contractual certainty in public EPC projects. In addition, the findings of this study contribute to the body of knowledge related to construction contracts by offering a framework for assessing the application of international forms of contracts under national procurement laws.