Against the backdrop of accelerating global low-carbon transition, the construction sector has emerged as a critical domain for carbon reduction. This paper establishes a carbon footprint calculation model for the materialisation phase of prefabricated residential buildings, grounded in the theory of whole-life-cycle carbon and the carbon emission factor method. It delineates phase boundaries and carbon source composition, while integrating project data to formulate computational expressions. Using Building 1 of YT Apartments as a case study for phased assessment, results indicate that the building material production phase accounts for the highest proportion of emissions (90.76%), followed by on-site construction (3.83%), material transportation (2.92%), on-site assembly (1.27%), component manufacturing (0.86%), and component transportation (0.36%). This demonstrates that the building material production phase holds the greatest potential for emissions reduction, providing theoretical support for low-carbon strategies in prefabricated housing.
21 August 2026 in Engineering, Construction and Architectural Management
Purpose: This study investigates the causal mechanisms underlying prefabricated building construction safety accidents (PBCSA) and aims to provide a systematic framework for identifying key risk factors and propagation pathways in complex construction environments. Design/methodology/approach: Based on 267 accident cases, 5 accident types and 101 causal factors were extracted. A weighted causal network was constructed using association rule mining (ARM), followed by structural analysis of network properties. A Multivariate Feature Graph Convolutional Network (MF-GCN) was developed to identify critical causal nodes, and a depth-first search algorithm was applied to extract representative causal pathways. Findings: The constructed causal network exhibits clear small-world characteristics and a heavy-tailed degree distribution, indicating a structured rather than random risk formation mechanism. MF-GCN significantly outperforms traditional centrality measures in identifying key causal factors, with root and direct causes accounting for approximately 75% of the most influential nodes. Risk propagation is primarily driven by a small number of recurrent causal chains, where factors such as improper lifting, inadequate risk assessment and insufficient safety distance act as key bridging nodes across accident types. Originality/value: This study integrates the “2–4” accident classification model with ARM and graph learning, providing a unified framework for causal structure discovery in construction safety systems. The proposed MF-GCN enhances the identification of influential risk nodes in complex accident networks, while the extracted causal chains reveal cross-type risk propagation mechanisms, offering actionable insights for proactive safety management.