Xueyuan Yan

Prof. Dr. Xueyuan Yan

orcid

Research Focus & Metrics

Academic Career Length

9Years (2018-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
18 July 2023 in Construction and Building Materials
Verified
Journal Article
Closed access
XXXiaoli Xiong
Xiaoli Xiong
ZYZhengxian Yang
Zhengxian Yang
XYXueyuan Yan
Xueyuan Yan
YZYong Zhang
Yong Zhang
SDShilin Dong
Shilin Dong
GMGiuseppe Carlo Marano
Giuseppe Carlo Marano

22 June 2020 in KSCE Journal of Civil Engineering
Verified
Journal Article
Open access
PDF file
LWLiyuan Wang
Liyuan Wang
XYXueyuan Yan
Xueyuan Yan
BFBing-hui Fan
Bing-hui Fan
RJRuoyu Jin
Ruoyu Jin
TYTong Yang
Tong Yang
GKGeorgios Kapogiannis
Georgios Kapogiannis
This pedagogical study presents building information modeling (BIM) education in the final semester construction management (CM) program. The case study conducted in Fuzhou University extends BIM education from a single BIM course in earlier undergraduate years to the senior year’s final semester project, which was designed to enable BIM utilization in multiple construction tasks (e.g., 3D site planning). This study consists of two major parts. The first part starts with the newly designed course of the final semester project of CM students. Students’ final semester project work is demonstrated depending on their selected deliverable type, which includes full BIM application group work, two partial BIM application types (i.e., construction planning/scheduling, and take-off estimate), and a research dissertation. The second part starts from the research hypothesis of whether the different deliverable type selected by students would affect their perceptions towards the final project and their professional career. Based on a follow-up questionnaire survey to the whole CM student sample aiming to test the hypotheses with statistical analyses (e.g., analysis of variance and the post-hoc analysis), it was indicated that all the four different deliverable types (i.e., subgroups) could lead to consistent perceptions of the final semester project towards their career development. However, subgroup differences were found. For example, students from the subgroup of full BIM application perceived that they had the highest level of hands-on skill enhancement throughout the project, possibly due to the fact that they linked BIM software tools to virtual reality (VR) hardware. Suggestions were provided to update the future BIM pedagogy in the final semester project, such as proper guide of CM students to opt their project deliverable type depending on their career interests, motivations in BIM utilization, and skill development needs. This current study provides insights in BIM education in terms that: 1) BIM education could be enhanced from a single course level to the senior year project in the CM program level; 2) different options offered in the final stage project within the CM curriculum might affect students’ perceptions towards BIM or their career development; and 3) the experience learned from this case study could be shared in the global community of construction education to update the curriculum incorporating information and communication technologies (e.g., BIM and VR). Future educational work in BIM could continue adopting existing educational theories (e.g., Bloom’s Taxonomy) by addressing the various levels of student learning, and viewing BIM in the bigger picture of digital construction.

1 December 2018 in Engineering Structures
Verified
Journal Article
Closed access
XYXueyuan Yan
Xueyuan Yan
ZCZaixian Chen
Zaixian Chen
AQAi Qi
Ai Qi
XWXuan Wang
Xuan Wang
SSShen Shi
Shen Shi

10 October 2018 in Applied Sciences
Verified
Journal Article
Open access
PDF file
XYXueyuan Yan
Xueyuan Yan
SWSuguo Wang
Suguo Wang
CHCanling Huang
Canling Huang
AQAi Qi
Ai Qi
CHChao Hong
Chao Hong
Precast monolithic structures are increasingly applied in construction. Such a structure has a performance somewhere between that of a pure precast structure and that of a cast-in-place structure. A precast concrete frame structure is one of the most common prefabricated structural systems. The post-pouring joint is important for controlling the seismic performance of the entire precast monolithic frame structure. This paper investigated the joints of a precast prestressed concrete frame structure. A reversed cyclic loading test was carried out on two precast prestressed concrete beam–column joints that were fabricated with two different concrete strengths in the keyway area. This testing was also performed on a cast-in-place reinforced concrete joint for comparison. The phenomena such as joint crack development, yielding, and ultimate damage were observed, and the seismic performance of the proposed precast prestressed concrete joint was determined. The results showed that the precast prestressed concrete joint and the cast-in-place joint had a similar failure mode. The stiffness, bearing capacity, ductility, and energy dissipation were comparable. The hysteresis curves were full and showed that the joints had good energy dissipation. The presence of prestressing tendons limited the development of cracks in the precast beams. The concrete strength of the keyway area had little effect on the seismic performance of the precast prestressed concrete joints. The precast prestressed concrete joints had a seismic performance that was comparable to the equivalent monolithic system.

7 October 2023 in Construction and Building Materials
Verified
Journal Article
Closed access
LLLin Lu
Lin Lu
Zhengxian YangZhengxian Yang
Zhengxian Yang
KLKang Li
Kang Li
KZKunchao Zhang
Kunchao Zhang
XYXueyuan Yan
Xueyuan Yan
Bruno BriseghellaBruno Briseghella
Bruno Briseghella

12 May 2022 in Structures
Verified
Journal Article
Closed access
HMHuimin Mao
Huimin Mao
XYXueyuan Yan
Xueyuan Yan
XWXiaoying Wei
Xiaoying Wei
XLXuhong Liu
Xuhong Liu