The method addresses the challenges of non-steady conditions at an early age by combining wavelet filtering and empirical mode decomposition (EMD) to separate strain components arising from shrinkage, expansive agent compensation, temperature variations, construction disturbances, and live loads. The approach incorporates construction logs as external constraints to ensure accurate correspondence between signal features and physical events. Scientifically, this study addresses the fundamental problem of identifying and quantifying multi-source strain components under transient and non-steady construction conditions, which remains a major challenge in the field of structural monitoring. Field monitoring was conducted on typical cast-in-place concrete components: a full-width bridge deck in the negative moment region. The results show that both structural types exhibit a distinct shrinkage–recovery process at an early age but differ in amplitude distribution, recovery rate, and restraint characteristics. During the construction procedure stage, the cast-in-place segment in the negative moment region was sensitive to prestressing and adjacent segment construction. Under variable loads, the former showed higher live load sensitivity, while the latter exhibited more pronounced temperature-driven responses. Total strain decomposition revealed that temperature and dead load were the primary long-term components in the structure, with differing proportional contributions. Representative strain variations observed in the field ranged from 10 to 50 µε during early-age shrinkage–expansion cycles to 80–100 µε reductions during prestressing operations, quantitatively illustrating the evolution characteristics captured by the proposed method. This approach demonstrates the method’s capability to reveal transient stress mechanisms that conventional steady-state analyses cannot capture, providing a reliable basis for strain monitoring, disturbance identification, and performance evaluation during construction, as well as for long-term prediction and optimization of operation–maintenance strategies.
Early-age cracking assessment requires distinguishing hydration-induced heating from the mechanical effects of restrained cooling. This study examines tensile stress and thermal responses to construction measures in a three-span concrete spine-beam bridge in Shaoxing, China. Temperature and strain were monitored at 34 locations and compared with a three-dimensional sequential model incorporating staged casting, age-weighted deformation increments, shrinkage, and stress relaxation. The baseline represents a 480 h construction window with an 8 d inter-pour interval. The mean absolute peak-temperature error was 3.19 °C; the strain comparison indicated limited agreement at the hourly scale. Thick rib–crossbeam intersections formed the principal thermal hotspots. Under the prescribed cooling boundaries and falsework restraints, the calculated thermal maximum of 87.76 °C occurred at 35 h in an intersection core, whereas the maximum principal tensile stress of 1.66 MPa occurred at 441 h near its lower edge. Lower placing temperatures reduced both maxima, while longer inter-pour intervals reduced temperature but increased tensile stress within 96 h after deck casting. These case-specific results support evaluating tensile stress and thermal indicators together and maintaining attention to restrained cooling after the hydration-temperature peak.