Anjay Mishra

Prof. Dr. Anjay Mishra

orcid

Research Focus & Metrics

Academic Career Length

9Years (2018-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
30 January 2019 in International Journal of Management Studies
Verified
Journal Article
Closed access
AMAnjay Mishra
Anjay Mishra

28 November 2018 in Journal of Advanced Research in HR & Organizational Management
Verified
Journal Article
Closed access
PDF file
AMAnjay Mishra
Anjay Mishra
Assessment of Human Resource Capacity of Construction Companies in Nepal

24 December 2018 in Journal of Advanced Research in Construction and Urban Architecture
Verified
Journal Article
Closed access
PDF file
AMAnjay Mishra
Anjay Mishra
SBSundar Bhandari
Sundar Bhandari
TJTulika Jha
Tulika Jha
Problems related to performances of the construction projects appear through different directions. Most of the projects fail either in time performance or in cost performance or both. So, the factors assessment in contemporary condition is most. This research was designed to conduct study of ten numbers of underconstruction projects funded by German government-owned development bank, KfW (Kreditanstalt für Wiederaufbau) via TDF. Questionnaire surveys were conducted and examination of records from concerned representatives of the client, consultants and contractors within the research area has been carried out. The factors affecting the overall project performance were ranked using ‘five-point’ scale ranged from 1 (not important) to 5 (extremely important) and transformed to Relative Importance Index (RII). All projects under study have been granted extension of time based on the Public Procurement Act (PPA) 2063 and Public Procurement Regulation (PPR) 2064.This study shows material related factors as the most important factors among 8 numbers of groups for time overrun in projects. The potential effect of the time overrun in project is cost overrun followed by arbitration, Litigation, Dispute arousal and Total abandonment. The major factors that affect the performance of the project according to the ranking based on RII value for the perceived view of the client, consultants and the contractors on factors affecting the performance are Design related issues, shortage of materials, Quality related issues, slow decision making, construction methodology, labour supply, payment related issues, site management ,discrepancies in contract documents, flaws in organisational structure, interfaces, productivity, change orders, unforeseen site condition, weather conditions and regulatory changes that affect the overall project performance. The major factors identified needs to be addressed to minimize the project time overrun and hence its effects on the Project.

13 August 2020 in Asian Journal of Civil Engineering
Verified
Journal Article
Closed access
PDF file
AMAnjay Mishra
Anjay Mishra
JSJ. S. Sudarsan
J. S. Sudarsan
SNSubramanian Nithiyanantham
Subramanian Nithiyanantham

28 August 2019 in Journal of Advanced Research in Civil and Environmental Engineering
Verified
Journal Article
Closed access
PDF file
AMAnjay Mishra
Anjay Mishra
CLChheku Lama
Chheku Lama
DSDinesh Prasad Sah
Dinesh Prasad Sah
DBDamyanti G Badagha
Damyanti G Badagha

31 March 2019 in International Journal of Research -GRANTHAALAYAH
Verified
Journal Article
Open access
PDF file
CLChheku Lama
Chheku Lama
DSDinesh Prasad Sah
Dinesh Prasad Sah
AMAnjay Mishra
Anjay Mishra
Construction of hydro power tunnel generates lots of occupational hazards. Due to different types of occupational hazards prevailed in tunnel construction, occupational accidents and diseases may affect health and safety of the workers. The main objective of this research was to identify the occupational hazards and assess their risks level. Head Race Tunnel of Middle Bhotekoshi Hydroelectric Project-102MW (MBKHEP) was selected for the study. This study has been carried out by utilizing the data collected from the duly filled semi structured questionnaires by the Employers’, Consultants’ and Contractors’ personnel. Moreover and key informant interview. Risk level of rock fall hazard has been revealed as the highest with risk score of 21.5 and fall under “Critical” risk level rating. Electric hazard and vibration have been found to have the risk score of 16 and 13.35 respectively both having “High” level of risk rating. Toxic gases like ammonia gases etc., dust hazards, hot and humid work environment, heat and humidity, tripping, ergonomics, chemical spills, oxygen deficiency, lighting, noise/sound and unprotected edges have been found to have risk scores 10,10,,9.5,9.215,9,8.65,8.1,8.1,7.6,6.75,6 respectively which all fall under the risk level rating of “Moderate”. Other hazards having “Low” risk rating level were alcoholism, fall from platform, job dissatisfaction, job Insecurity, hit by aggregate, radiations, mechanical struck, slippery, snake bites, water inundation, deadline pressure and bat biting with respective risk scores 5.25,4.8,4.6,4.45,4.3,4,4,4,4,3,2.85,2.