Junkai Wang

Prof. Junkai Wang

orcid

Research Focus & Metrics

Academic Career Length

8Years (2019-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
20 June 2019 in IEEE Transactions on Systems, Man, and Cybernetics: Systems
Verified
Journal Article
Closed access
LZLianlian Zhang
Lianlian Zhang
FQFei Qiao
Fei Qiao
JWJunkai Wang
Junkai Wang
XZXiaodong Zhai
Xiaodong Zhai
With the rapid development of Internet-of-Things and big data, health assessment of equipment is receiving more attention in recent years. It is critical to bridge the gap between real-time production data and health status evaluation, which helps maintenance team understand the health status of equipment exactly, and then make rational maintenance plans. For this purpose, this paper proposes a framework to realize real-time equipment health assessment with health status quantitatively characterized by health degree (HD). The proposed framework begins with removing redundant features using a principal component analysis (PCA) method. Then, to represent the optimal operation status, a support vector data description (SVDD) algorithm is employed for extracting normal observations in the offline part. Thereafter, HD is introduced based on the Euclidean distance between current observation and the normal sample set. In order to achieve online updating of the normal sample set, and promote accuracy and computational efficiency of the offline part, an improved incremental SVDD algorithm based on adaptive threshold N (NISVDD) is proposed. A case study is used to demonstrate the effectiveness of the proposed framework and model using a benchmark dataset of rolling bearing. Results suggest that the proposed framework is effective, and PCA shows good potential to extract features and keep most of the original information. The proposed NISVDD model is able to trace the dynamics of equipment health status for whole run-to-failure process, and outperforms other models in both accuracy and computational efficiency.

29 June 2020 in IEEE Robotics and Automation Letters
Verified
Journal Article
Closed access
JWJunkai Wang
Junkai Wang
HDHangming Du
Hangming Du
JXJunxia Xing
Junxia Xing
FQFei Qiao
Fei Qiao
YMYumin Ma
Yumin Ma
Limited energy supply and uncertain equipment state increase the complexity of production process. Peak power and maintenance-based demand response facilitates factories to adjust scheduling strategies to actual production circumstances, so that a rise in energy cost penalty and machine breakdown could be avoided without affecting normal production on the shop floor. This letter proposes a mixed integer programming (MIP) model for a hybrid flow shop (HFS) to minimize makespan, with the consideration of machine maintenance plans and peak power consumption constraint. Two paradigms of a dual memetic algorithm (DMA) that combines genetic algorithm with two novel heuristic algorithms are proposed according to the characteristics of the problem. To enable maintenance awareness, a heuristic algorithm for machine maintenance is designed to reorganize current production sequences. To enable peak power awareness, a heuristic algorithm based on chromosome priority sequence is put forward. A case study from benchmarks demonstrates the effectiveness of the proposed model and algorithms. The performance of both paradigms is discussed.

29 November 2024 in Expert Systems with Applications
Verified
Journal Article
Closed access
YMYumin Ma
Yumin Ma
LLLuyao Li
Luyao Li
JSJiaxuan Shi
Jiaxuan Shi
Juan LiuJuan Liu
Juan Liu
FQFei Qiao
Fei Qiao
JWJunkai Wang
Junkai Wang

24 May 2025 in Robotics and Computer-Integrated Manufacturing
Verified
Journal Article
Closed access
XZXiong Zheng
Xiong Zheng
FQFei Qiao
Fei Qiao
SYShiqi You
Shiqi You
XWXi Vincent Wang
Xi Vincent Wang
LWLihui Wang
Lihui Wang
JWJunkai Wang
Junkai Wang

18 July 2022 in IEEE Robotics and Automation Letters
Verified
Journal Article
Closed access
PZPeng Zhang
Peng Zhang
FQFei Qiao
Fei Qiao
JWJunkai Wang
Junkai Wang
John SutherlandJohn Sutherland
John Sutherland
Achieving sustainability is currently an important development direction for the manufacturing industry. With the consideration of all pillars of sustainability, valid evaluation of sustainability during scheduling optimization has become an emerging critical issue in the production scheduling loops. In view of absence of comprehensive sustainable evaluation strategy, this letter proposes a novel multi-criteria evaluation method based on fuzzy analytic network process (FANP) and cumulative prospect theory (CPT)-enhanced VlseKriterijumska Optimizacija I Kompromisno Resenje (FANP-CVIKOR). To this end, we firstly identify fundamental performance indicators from the production scheduling scope, and construct a four-layer indicator system in light of the process sustainability index (ProcSI) architecture. Then, the weights of all hierarchical indicators are derived by designing a fuzzy-improved ANP method to better quantitatively depict the relative significance of indicators. On this basis, a VIKOR method enhanced by CPT is put forward to obtain the ranking of candidate scheduling schemes, in which CPT is capable to reflect the mental attitudes of a decision maker via the prospect value of a scheme. A case study for the flexible job shop validates the correctness and effectiveness of the proposed methodology. Meanwhile, the stability and sensitivity are further discussed, suggesting good potential in real-world applications.

6 January 2025 in IEEE Robotics and Automation Letters
Verified
Journal Article
Closed access
HWHaixuan Wang
Haixuan Wang
FQFei Qiao
Fei Qiao
SJShengxi Jiang
Shengxi Jiang
HZHaibin Zhu
Haibin Zhu
JWJunkai Wang
Junkai Wang
The deterioration phenomenon is common and lasting as machines' service time increases within energy-intensive manufacturing processes such as heat treatment, which may bring about processes time extension or even the breakdown of a machine. It is crucial to collaboratively optimize batch scheduling and maintenance to ensure stable, efficient production, and achieve energy efficiency. This study takes into account preventive maintenance, where a maintenance activity is carried out after a certain number of batches are processed. A novel multi-objective mixed-integer programming model for unrelated parallel batching machines is proposed to minimize the makespan, total completion time and total energy consumption. The entire problem is broken down into four sub-issues: job division, job dispatching, batch formation and batch sequencing. Given the NP-hard nature of the problem, three heuristic algorithms based on several structural properties are designed according to the features of the latter three parts. Meanwhile, an integrated methodology, a Multi-Objective Evolutionary Algorithm based on Decomposition combined with Variable Neighborhood Search (MOEA/D-VNS), is put forward to handle job division and the multi-dimensional collaborative optimization problem. The performance of the proposed algorithms is compared with that of other typical dominance-based evolutionary algorithms. Extensive numerical experiments are conducted to validate the effectiveness of the proposed model and algorithms.