Monitoring power quality is essential for evaluating the performance of power systems. Transient power quality events (TPQE), such as voltage sags and swells, represent significant challenges that can lead to substantial economic losses for both utilities and their customers. Despite the widespread installation of power quality monitors (PQMs) across various locations to capture the waveforms of TPQEs, it remains challenging to determine whether these TPQEs, recorded by different monitors, originate from the same source, particularly when the time synchronization of PQMs is inaccurate. Furthermore, to date, no method has been developed for identifying events from the same source, leading to redundancy and invalidation of data in subsequent analyses. In response, a method for identifying events from the same source is proposed, utilizing a framework that includes modules for clustering by occurrence time, mining mapping relationships, and evaluating waveform similarity. This framework is applicable to distributed networks, even those with unknown topology and parameters, requiring only previously recorded waveforms. It also features the ability to adaptively update its parameters for optimal identification based on historical data, even after network reconfigurations. The effectiveness and reliability of this method have been verified through the analysis of hundreds of field recordings.
The high-level proliferation of inverter-interfaced distributed generators (IIDGs) in modern distribution networks (DNs) has changed system topologies and fault current signatures, which compromises the protective relays in DNs. Investigating IIDG fault behaviors-based protection scheme will benefit the grid’s safety and stability. This paper proposes a novel current differential protection (CDP) scheme that considers the delay behaviors of positive- and negative-sequence component extractors for IIDGs in DNs. A frequency-domain analytical model of the fault current for a grid-connected IIDG with the PQ control strategy and a low-voltage ride-through (LVRT) capability is investigated. The dynamic behavior of the IIDGs considering the sequence-component extractor based on the Pade approximation is presented, where the T/4 delay extractor of the IIDGs causes a two-stage behavior in the fault transient process. It is found that a 5 ms error between the measured and actual values after the fault will affect the transient characteristics of the IIDGs. The transient current generated by the IIDGs during grid faults contains a large number of low-order harmonic components within the range of 0–200 Hz, which is significantly different to the current provided by the power grid. Therefore, the proposed CDP scheme uses protective relays at both terminals to obtain the required transient electric quantity using the Prony method. By constructing the frequency-characteristics ratio (FCR) and the exchanging FCR between two terminal relays, the developed protection criteria are implemented. The accuracy of the fault analysis method, whose maximum computational error is below 0.1%, and the feasibility of the proposed protection scheme are demonstrated by using a 10 kV DN in a PSCAD/EMTDC simulation, which can be applied to various fault conditions and traditional DNs without IIDGs.
Accurate localization of voltage sag sources is crucial for maintaining reliable and stable operation in microgrids with high penetration of distributed generation (DG). However, the complex topology, bidirectional and time-varying power flows, and measurement uncertainty make it difficult for these conventional model-based approaches to achieve high accuracy. To address these challenges, this paper proposes a two-stage voltage sag source localization method that integrates a data-driven spatio-temporal learning model with a model-based binary search refinement. In the first stage, an improved spatial-temporal graph convolutional network (STGCN) is developed to extract temporal and spatial correlations among voltage and current measurements, enabling section-level localization of sag sources. In the second stage, a binary search–based refinement strategy is applied within the candidate section to iteratively converge on the exact fault location with high precision and robustness. Simulations are conducted on a modified IEEE 33-node system with diverse PV output scenarios, covering combinations of fault types and locations. The results demonstrate that the proposed method maintains stable localization performance under high DG penetration and achieves high accuracy despite multiple fault types and noise interference.
Accurate modeling for power-electronic devices requires power systems to be simulated with considerably small step sizes (typically several microseconds), which causes unnecessary computational burden and reduces efficiency, especially for large-scale power systems. To achieve a balance between simulation precision and efficiency, this paper introduces an innovative multi-rate interface strategy based on the modified time-domain simulation (TDS) method and multi-area data exchange method. The modified TDS method transforms the initialization process into exchange of electric data among different subsystems, while the multi-area data exchange method is able to ensure numerical stability and simulation universality during the multi-rate simulation. The proposed strategy provides a robust interface that allows different subsystems to be engaged in simulations with different step sizes while exchanging data. To validate this strategy, simulations on an integrated system of IEEE 14-bus and 33-bus systems is conducted. In addition, the strategy is further applied to a real-world scenario of the subsystem in the Guangxi Power Grid in China. Analysis of the results indicates that the proposed multi-rate fast simulation strategy can significantly boost simulation efficiency while maintaining accuracy, which marks a notable improvement compared with the traditional single step size simulation.
Uncertain variables, such as electric power system parameters, have significant impacts on dynamic simulations of power systems. As traditional uncertainty analysis methods for power system dynamic simulations, both the simulation method and the approximation methods are difficult to balance the model complexity, computational efficiency, and simulation accuracy. In order to balance the model complexity, computational efficiency, and simulation accuracy, this paper proposes a method for uncertainty analysis for power system dynamic simulation based on the Nataf transformation and Gaussian-Hermite quadrature. Firstly, the samples on the normal distribution space are determined according to the Gaussian-Hermite quadrature points and the Nataf transformation. Secondly, obtain the simulation samples by inverse Nataf transformation, and perform power system dynamic simulation. Thirdly, the random output is approximated as a linear combination of a single random input, and the mean and standard deviation of the random output under the impact of a single random input are calculated by Gaussian-Hermite quadrature. Then, calculate the mean and standard deviation of the random output under the impact of all random input. Finally, the effectiveness of the proposed method is validated on the IEEE 9-bus system and IEEE 39-bus system. Compared with Monte Carlo simulation and Latin Hypercube sampling, the proposed method can greatly reduce the simulation time for uncertain dynamic simulations while maintaining high accuracy.
The construction of an energy distribution network can improve the system’s ability to absorb new energy, and its stable and efficient operation has become more and more important. The security and stability analysis of a distribution network needs accurate distribution network model parameters as support. At present, the installation of PMU equipment in China’s distribution network synchronous phase angle measurement unit is limited, which brings challenges to the parameter correction of the distribution network. In this paper, an automatic correction algorithm of distribution network parameters based on the CIM model and measurement data is proposed for the distribution network system without PMU. Firstly, the distribution network topology construction technology based on XML files and key fields of the distribution network is proposed, and the non/small impedance devices (such as switches) are merged and reduced. The breadth-first traversal algorithm is used to verify the connectivity of the constructed topology. Then, based on the topology construction and the least squares method, an iterative parameter correction technique is constructed. Finally, the accuracy and effectiveness of the proposed algorithm are verified in a standard IEEE 33-bus system distribution network and an example of the China Southern Power Grid. The topology connections constructed based on the CIM model have significantly enhanced the efficiency of parameter correction.