Zeinab Farrokhi

Dr. Zeinab Farrokhi

orcid

Research Focus & Metrics

Academic Career Length

2Years (2025-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
31 May 2025 in Forecasting
Verified
Journal Article
Open access
PDF file
KBKamran Hassanpouri Baesmat
Kamran Hassanpouri Baesmat
ZFZeinab Farrokhi
Zeinab Farrokhi
GCGrzegorz Kamil Chmaj
Grzegorz Kamil Chmaj
EREmma Regentova
Emma Regentova
In this work, we present a novel approach for predicting short-term electrical energy consumption. Most energy consumption methods work well for their case study datasets. The proposed method utilizes a cloud computing platform that allows for integrating information from different sources, such as weather data and historical energy consumption, while employing machine learning techniques to achieve higher accuracy in forecasting. We collected detailed weather data from the “Weather Underground Company” website, known for its accurate records. Then, we studied past energy consumption data provided by PJM (focusing on DEO&K, which serves Cincinnati and northern Kentucky) and identified features that significantly impact energy consumption. We also introduced a processing step to ensure accurate predictions for holidays. Our goal is to predict the next 24 h of load consumption. We developed a hybrid, generalizable forecasting methodology with deviation correction. The methodology is characterized by fault tolerance due to distributed cloud deployment and an introduced voting mechanism. The proposed approach improved the accuracy of LSTM, SARIMAX, and SARIMAX + SVM, with MAPE values of 5.17%, 4.21%, and 2.21% reduced to 1.65%, 1.00%, and 0.88%, respectively, using our CM-LSTM-DC, CM-SARIMAX-DC, and CM-SARIMAX + SVM-DC models.

28 October 2026 in Scientific Reports
Verified
Journal Article
Open access
PDF file
KBKamran Hassanpouri Baesmat
Kamran Hassanpouri Baesmat
ZFZeinab Farrokhi
Zeinab Farrokhi
EREmma E. Regentova
Emma E. Regentova
Accurate day-ahead electricity price forecasting, particularly in the context of customer-centric services and emerging smart city infrastructures, is a cornerstone of efficient power market operations, supporting bidding strategies, hedging, and grid reliability. This paper proposes SSXLR, a fault-tolerant hybrid forecasting framework that combines Seasonal Autoregressive Integrated Moving Average with Exogenous variables (SARIMAX), Extreme Gradient Boosting (XGBoost), and Long Short-Term Memory (LSTM) within a 2-out-of-3 voting architecture to capture both linear seasonal trends and nonlinear temporal dynamics while reducing dependence on a single forecasting branch. The proposed method was evaluated using one year of historical data (July 1, 2024–July 1, 2025) from Duke Energy Ohio and Kentucky (DEO&K) within the PJM interconnection. The dataset integrates day-ahead market prices ($/MWh), corresponding load consumption (MW), eleven weather variables, and population growth indicators. The target is the day-ahead price profile for July 2, 2025, consisting of 24-hourly points. Results show that SSXLR achieves more than 30% reduction in Root Mean Squared Error over SARIMAX and XGBoost, respectively. The Mean Absolute Error (MAE) reached 1.196, demonstrating the ability of SSXLR to account effectively for external market drivers and temporal dependencies. These findings highlight the scalability of the proposed framework for regional electricity markets, where accurate day-ahead forecasting can improve operational planning, supply–demand balance, and economic efficiency. The proposed framework is dynamic and region-adaptable, allowing it to be transferred to other smart city or regional energy systems when electricity price, load/consumption, weather, and calendar data are available. Beyond improving predictive accuracy, the 2-out-of-3 voting mechanism provides a fault-tolerant forecasting layer by allowing the final output to be determined from the two most consistent forecasting branches when one branch becomes unavailable or produces an unreliable output.