ROBERT PARCIAK

Mr. ROBERT PARCIAK


Research Focus & Metrics

Academic Career Length

2Years (2025-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
18 December 2025 in Energies
Verified
Journal Article
Open access
PDF file
EGEdward Gulski
Edward Gulski
GAGeorge Anders
George Anders
JPJaroslaw Parciak
Jaroslaw Parciak
LPLaurens Pots
Laurens Pots
RPROBERT PARCIAK
ROBERT PARCIAK
The reliability of an offshore wind farm (OWF) depends strongly on the export and inter-array cable installations. AC export cables (EXCs) are typically up to 120 km long and operate at voltages ranging from 220 to 275 kV. The newest inter-array cables (IACs) operate at 66 kV and can be up to 20 km long. They connect individual wind turbines to the offshore substation. This paper discusses current failure statistics and costs, as well as the technical challenges associated with different site acceptance testing (SAT) methods for offshore wind farm export and inter-array cables. The technical benchmark analysis for both EXCs and IACs shows the most reliable solutions for SAT. Moreover, practical applications based on 13 international OWF installations show that damped AC (DAC) supports quality control of newly installed EXC and IAC cable systems and provides a solid basis for in-service condition-based maintenance.