The fluctuating uncertainty of load demand as an influencing factor for day-ahead scheduling of an integrated energy system with photovoltaic (PV) power generation may cause an imbalance between supply and demand, and to solve this problem, this paper proposes a day-ahead optimal scheduling model considering uncertain loads and electric heating appliance (EH)–PV energy storage. The model fuses the multi-interval uncertainty set with the CNN-MI-BILSTM neural network prediction technique, which significantly improves the accuracy and reliability of load prediction and overcomes the limitations of traditional methods in dealing with load volatility. By integrating the EH–photothermal storage module, the model achieves efficient coupled power generation and thermal storage operation, aiming to optimize economic targets while enhancing the grid’s peak-shaving and valley-filling capabilities and utilization of renewable energy. The validity of the proposed model is verified by algorithm prediction simulation and day-ahead scheduling experiments under different configurations.
To address the insufficient consideration of system static voltage stability and PV–load coupling in distributed photovoltaic (PV) hosting capacity assessment, this study first investigates the impact of distributed PV integration on power system transient voltage stability based on a typical power supply system. Building on this analysis, we propose a Static Grid Stability Margin (SGSM) index. Subsequently, leveraging historical PV and load data, the copula function is introduced to establish a joint distribution function characterizing their correlation. Massive evaluation scenarios are generated through sampling, with robust clustering methods employed to form representative evaluation scenarios. Finally, a distributed PV bearing capacity assessment model is established with the objectives of maximizing PV bearing capacity, optimizing economic efficiency, and enhancing static voltage stability. Through simulation verification, the power system has a higher capacity for distributed PV when distributed PV is integrated into nodes with weak static voltage stability and a decentralized integration scheme is adopted.
Cost-effective renewable accommodation is essential for sustainable power-system planning. In power systems with high renewable penetration, using a high renewable energy utilization rate as a rigid target may require excessive investment in peak regulation, energy storage, and grid reinforcement to absorb a small amount of marginal renewable generation, which increases the total cost of power supply. This paper proposes a dynamic estimation method for determining a reasonable renewable energy utilization rate by linking planning and operation under the criterion of minimum total system cost. At the planning layer, the optimal renewable capacity expansion and its corresponding utilization rate are determined by minimizing the sum of annualized investment cost and comprehensive operating cost. At the operation layer, year-round chronological production simulation is combined with discrete search over curtailment penalty parameters to identify the utilization level that gives the minimum total cost under given system boundaries. A case study of the Gansu power grid shows that the reasonable planning-layer utilization rates in 2028, 2030, 2035, and 2040 range from 84% to 88%, while the operation-layer utilization rates in 2028 and 2030 are 90.81% and 91.84%, respectively. City-level decomposition further shows that resource-rich areas such as Jiayuguan-Jiuquan generally have lower utilization rates than most load centers. An equal-investment comparison shows that deep peak regulation of thermal power units improves the utilization rate the most but increases the power supply cost, whereas pumped storage gives better cost-reduction performance. The results indicate that reasonable renewable energy utilization rates should be evaluated on a rolling basis to support sustainability-oriented target setting and coordinated source-grid-load-storage planning.