王 钢

Dr. 王 钢

orcid

Research Focus & Metrics

Academic Career Length

2Years (2025-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
9 December 2025 in Sustainability
Verified
Journal Article
Open access
PDF file
ASAdilanmu Sitahong
Adilanmu Sitahong
王钢王 钢
王 钢
YYYiping Yuan
Yiping Yuan
AWAreziguli Wubuli
Areziguli Wubuli
PMPeiyin Mo
Peiyin Mo
CYChen Yulong
Chen Yulong
In recent decades, the flexible job shop scheduling problem (FJSP) has been widely studied. In the context of green manufacturing, objectives related to energy consumption and sustainability have emerged as essential components of the contemporary production landscape. These scheduling objectives present new obstacles for workshop coordination, routing, and process planning. Among various green scheduling targets, energy consumption objectives constitute a substantial share. Therefore, this paper focuses on the dynamic flexible job shop scheduling problem (DFJSP) with an emphasis on energy consumption. First, this paper reviews the literature on DFJSP that considers energy consumption over the past decade. Second, this paper categorizes the dynamic constraints and dynamic event handling strategies in the indexed literature. Additionally, this paper examines the current methods for addressing this complex scheduling problem and compares and evaluates their advantages and disadvantages. Finally, this paper proposes new insights for future research from the perspectives of algorithms and energy-saving strategies.