The widespread adoption of electric vehicles (EVs) is contingent on high-power fast-charging infrastructure that can also provide grid stabilization services through bidirectional power flow. While the constituent power stages of such off-board chargers are well-known, a critical research gap exists in their system-level integration, where sub-optimal dynamic interaction between independently controlled stages often leads to DC-link instability and poor transient performance. This paper presents a rigorous, system-level study to address this gap by developing and optimizing a unified control framework for a high-power bidirectional EV fast-charging system. The system integrates a three-phase active front-end rectifier with an LCL filter and a four-phase interleaved bidirectional DC/DC converter. The methodology involves a holistic dynamic modeling of the coupled system, the design of a hierarchical control strategy augmented with a battery current feedforward scheme, and the system-wide optimization of all Proportional–Integral (PI) controller gains using the Artificial Bee Colony (ABC) algorithm. Comprehensive simulation results demonstrate that the proposed optimized control framework achieves a critically damped response, significantly outperforming a conventionally tuned baseline. Specifically, it reduces the DC-link voltage settling time during charging-to-discharging transitions by 74% (from 920 ms to 238 ms) and eliminates voltage undershoot, while maintaining excellent steady-state performance with grid current total harmonic distortion below 1.2%. The study concludes that system-wide metaheuristic optimization, rather than isolated component-level design, is key to unlocking the robust, high-performance operation required for next-generation EV fast-charging infrastructure, providing a validated blueprint for future industrial development.
The integration of photovoltaic (PV) generation with bidirectional electric vehicle (EV) fast-charging systems offers a promising pathway toward sustainable transportation and grid support. However, the dynamic coupling between maximum power point tracking (MPPT) perturbations and grid-side power quality presents a fundamental challenge in such multi-converter architectures. This paper addresses this challenge through a coordinated design and optimization framework for a grid-connected, PV-assisted bidirectional off-board EV fast charger. The system integrates a 184.695 kW PV array via a DC-DC boost converter, a common DC link, a three-phase bidirectional active front-end rectifier with an LCL filter, and a four-phase interleaved bidirectional DC-DC converter for the EV battery interface. A comparative evaluation of three MPPT algorithms establishes the Fuzzy Logic Variable Step-Size Perturb & Observe (Fuzzy VSS-P&O) as the optimal strategy, achieving 99.7% tracking efficiency with 46 μs settling time. However, initial integration of this high-performance MPPT reveals system-level harmonic distortion, with grid current total harmonic distortion (THD) reaching 4.02% during charging. To resolve this coupling, an Artificial Bee Colony (ABC) metaheuristic algorithm performs coordinated optimization of all critical PI controller gains. The optimized system reduces grid current THD to 1.40% during charging, improves DC-link transient response by 43%, and enhances Phase-Locked Loop (PLL) synchronization accuracy. Comprehensive validation confirms robust bidirectional operation with seamless mode transitions and compliant power quality. The results demonstrate that system-wide intelligent optimization is essential for reconciling advanced energy harvesting with stringent grid requirements in next-generation EV fast-charging infrastructure.