Transport infrastructure is one of the most important elements needed for the reliable development and economic growth in an evolving country. Because most of the infrastructure is already built, road managers consider necessary to study, develop and implement bridge degradation monitoring systems. If the technical state of the structures is known in every moment, decisions to intervene on degradations at the right moment from the very first stages of their development can be made more easily. In order to implement an efficient monitoring system, it is necessary to know the dynamic characteristics of the non-degraded structure, and that is difficult to achieve when bridges are already in operation. To minimize those disadvantages, researchers have developed various methods of modelling structures to address the lack of initial data. In this paper, the authors present a case study about the determination of the modal shapes, the frequencies and the displacements of the bridge located on the national road DN 28 at km 6 + 957, in Şcheia, Romania. The superstructure will be modelled through the Ansys program, determining the theoretical dynamic characteristics. These will be needed in the next stage of the experimental process to compare the numerical data to those from the in-situ monitoring system.
1 December 2023 in Bulletin of the Polytechnic Institute of Iași. Construction. Architecture Section
Bridge maintenance work represents one of the main activities dedicated to the maintenance and repair of roads in operation. It plays a primary role within the activities undertaken by public administrators. Periodic maintenance work are large-scale works that are executed with a certain specific periodicity. They are planned in advance and aim to partially or fully compensate for the degradation and wear of the road infrastructure. This article aims to briefly present the periodic maintenance works designed to bring the bridge located on the Romanian national road DN 28 at km 6+957 to an optimal state of normal operation. The structure in question was built in 1963, with a total length of 236.90 meters. It consists of two metal I-type girders, continuous next to the piles, arranged at an interaxial distance of 7.10 meters. Before the execution of periodic maintenance works, the reinforced concrete decking, which supports the carriageway and sidewalks, rested directly on the upped soles of the stringers and main girders, without any intermediate element to ensure cooperation. The planned periodic maintenance works aim to bring the structure to normal parameters necessary for safe exploitation and also to increase the comfort of traffic by increasing the total width of the entire structure, including the pedestrian sidewalks. This modification of the constructive parameters is based on calculation of strength and stability, taking into account the new operating time provided to the structure by the execution of periodic maintenance works.