Cheng Gao Yan

Prof. Cheng Gao Yan


Research Focus & Metrics

Academic Career Length

11Years (2016-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
22 January 2022 in Journal of Thermal Science
Verified
Journal Article
Closed access
PDF file
CYCheng Gao Yan
Cheng Gao Yan

1 August 2016 in Renewable Energy
Verified
Journal Article
Closed access
TRTing Ren
Ting Ren
YSYang Sun
Yang Sun
JZJiye Zhang
Jiye Zhang
CYCheng Gao Yan
Cheng Gao Yan
HMHuaiping Mu
Huaiping Mu
SLShi Liu
Shi Liu

17 November 2026 in Energies
Verified
Journal Article
Open access
PDF file
CYCheng Gao Yan
Cheng Gao Yan
YMYubin MA
Yubin MA
LZLixing Zheng
Lixing Zheng
XXXiaojun Xue
Xiaojun Xue
QMQianzi Ma
Qianzi Ma
CYCong Yin
Cong Yin
Wind–solar–coal systems require flexible generation and storage operation to accommodate renewable variability while meeting regional demand and scheduled electricity exports. Coordinating coal-fired units with molten salt thermal energy storage can improve renewable integration and operating economy. However, day-ahead schedules depend on uncertain net load forecasts, and higher forecast accuracy does not necessarily yield lower operating costs. This paper proposes a cost sensitivity-assisted forecast correction framework to improve the economic value of net load predictions. Analysis of the scheduling model links forecast errors to asymmetric balancing costs, equipment state changes, and inter-temporal storage constraints. Starting from a temporal convolutional network forecast, the framework learns cost responses to signed forecast perturbations evaluated through the complete scheduling model. These responses supervise action value differences in the critics of a soft actor–critic agent, guiding joint correction of hourly forecasts to minimize realized daily cost. Tests on the Reliability Test System–Grid Modernization Laboratory Consortium benchmark show a 7.47% reduction in mean realized cost relative to the uncorrected temporal forecast, despite higher forecast error. With identical cost sensitivity inputs, auxiliary critic supervision reduces mean cost by 2.01% compared with ordinary critic training.