Jianlin Zhou

Dr. Jianlin Zhou


Research Focus & Metrics

Academic Career Length

2Years (2025-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
17 January 2026 in Applied Sciences
Verified
Journal Article
Open access
PDF file
PYPeng Yanghao
Peng Yanghao
HJHanze Jiang
Hanze Jiang
ZPZhenjie Peng
Zhenjie Peng
QFQiang Fu
Qiang Fu
CLChangjiang Li
Changjiang Li
JZJianlin Zhou
Jianlin Zhou
Roadways driven along the floor of thick coal seams, while retaining the top coal, form “thick coal seam floor roadways.” These large-section roadways feature a composite coal-rock roof and weak coal ribs, leading to low overall strength and poor stability of the surrounding rock. Significant deformation and “necking” often occur, accompanied by roof falls and rib spalling, which are exacerbated under high stress or adverse geology, threatening mine safety and production. In this study, the 2201 haulage gateway in Yingpanhao Coal Mine is investigated to address surrounding rock control in such deep roadways. Using field investigation, theoretical analysis, numerical simulation, and similar simulation tests, the failure mechanisms of ribs and roofs are analyzed. Rib failure is characterized by tensile fracture in the shallow zone, splitting failure in the medium-depth zone, and incomplete conjugate shear in the deep zone. Corresponding mechanical models are established, and a method for calculating total rib failure depth—combining tensile/splitting and shear failure depths—is proposed, along with a bolt length design formula. Based on this, a synergistic roof-and-rib support technology is developed. The failure mechanism and optimal support scheme are validated through simulation tests and successfully applied in the field, demonstrating satisfactory performance. The findings provide a valuable reference for support design in similar mining roadways.

17 November 2025 in Applied Sciences
Verified
Journal Article
Open access
PDF file
QFQiang Fu
Qiang Fu
HYHong Yang
Hong Yang
JZJiaWang Zhan Zhan
JiaWang Zhan Zhan
JZJianlin Zhou
Jianlin Zhou
HGHainan Gao
Hainan Gao
YSYue Shi Shi
Yue Shi Shi
The rapid development of transportation infrastructure in challenging geological regions necessitates innovative tunneling methods that balance efficiency, safety, and cost. This study addresses the critical construction bottleneck of large-span soft rock tunnels under high ground stress, where conventional methods often lead to unacceptable delays. Focusing on a 24.53 m span railway tunnel in southwest China, we present the significant engineering application of a “pilot-tunnel-first” method as a strategic solution to stringent schedule pressures. The core innovation lies not only in the adoption of a large 13.2 m wide pilot tunnel but also in a synergistically enhanced support system, featuring elongated bolts (6 m and 12 m) and strengthened steel arches. Numerical simulations and field validation confirmed that this optimized approach achieves a stability comparable to the traditional double-side drift method while dramatically accelerating progress. The successful implementation shortened the construction period by 1.96 months for a key 123 m section, with a manageable cost increase of approximately Chinese Yuan (CNY) 782,000, thereby ensuring the timely opening of the entire tunnel. The primary significance of this research is to provide a proven and practical technical strategy for overcoming similar soft rock tunneling challenges where project timelines are paramount, offering a substantial value for the design and construction of modern infrastructure under complex constraints.

30 June 2026 in Symmetry
Verified
Journal Article
Open access
PDF file
PYPeng Yanghao
Peng Yanghao
HJHanze Jiang
Hanze Jiang
ZPZhenjie Peng
Zhenjie Peng
ADAizhong Ding
Aizhong Ding
YLYuxuan Liu
Yuxuan Liu
JZJianlin Zhou
Jianlin Zhou
To overcome the deformation and failure of surrounding rock in bottom-driven roadways within thick coal seams, this paper proposes a cooperative support theory for the sides and roof of such roadways in deep thick coal seams, based on existing support theories and technologies. The haulage roadway of the 2201 working face in the Yingpanhao Coal Mine is taken as the engineering prototype. Using the proposed theory, three optimized support schemes are developed. Numerical simulations are conducted to compare the deformation and failure behavior of roadway surrounding rock under the original support scheme and the three optimized schemes. The optimal scheme identified by simulation is then implemented in field engineering. The results show that, relative to the original scheme, roof subsidence is reduced by 51.99 mm, 43.83 mm, and 21.41 mm for Optimized Schemes 1, 2, and 3, respectively, corresponding to reductions of approximately 39.71%, 33.48%, and 16.35%. Under the three optimized schemes, the convergence of the two sidewalls decreases from 480.21 mm to 157.73 mm, 250.84 mm, and 424.24 mm, i.e., reductions of about 67.15%, 47.76%, and 11.66%, respectively. Under the original support scheme, the vertical stress concentration zone is located approximately 5.4 m from the roadway side. Under the three optimized schemes, this distance is reduced to 3.6 m, 3.8 m, and 4.8 m, respectively. The extent of the plastic zone is also smaller under the optimized schemes than under the original scheme, with Scheme 1 exhibiting the greatest reduction. Based on a comprehensive comparison, Optimized Scheme 1 is selected as the optimal support scheme. In addition, Scheme 1 improves deformation asymmetry, with the left–right sidewall asymmetry index decreasing from 3.34% to 0.06% and the sidewall–roof imbalance index decreasing from 3.67 to 2.00. Field application further confirms that this scheme substantially reduces roof–floor convergence and sidewall convergence, verifying the feasibility of the proposed cooperative support theory and technology for the sides and roof in deep bottom-driven roadways of thick coal seams.