Shizhong Zhang

Dr. Shizhong Zhang


Research Focus & Metrics

Academic Career Length

3Years (2024-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
7 June 2024 in Processes
Verified
Journal Article
Open access
PDF file
WYWei Yu
Wei Yu
Gangwei FanGangwei Fan
Gangwei Fan
Dongsheng ZhangDongsheng Zhang
Dongsheng Zhang
WGWenhao Guo
Wenhao Guo
WZWenhui Zhang
Wenhui Zhang
ZFZhanglei Fan
Zhanglei Fan
The width of a stop-mining coal pillar is of great significance to the stability of the surrounding rock of the main roadway and the safety of production in the mine. This paper focuses on the west panel of Sihe Coal Mine as the engineering background, analyzes the evolution characteristics of front abutment pressure in the mining area under conditions of rapid advancement and large mining height and its sensitivity to influencing factors, explores the coupling mechanism between the width of the stop-mining coal pillar and the surrounding rock of the main roadway, and analyzes the differences in mining pressure characteristics such as internal stress of the coal pillar, vertical stress, deformation, and failure of the main roadway’s surrounding rock under different coal pillar widths with the influence of mining. The comprehensive results indicate that the influence range of front abutment pressure on the working face is 65 m, and the significance ranking of different mining factors acting on it is as follows: mining height > working face length > advancing speed. The rational width of the stop-mining coal pillar is determined to be 80 m while the stress field of the surrounding rock in the main roadway is in a critical state of mining disturbance. Industrial tests have shown that the relative displacements between the roof and floor as well as the ribs of the main roadway are relatively small, at 105 and 260 mm, respectively, which can effectively maintain the stability of the surrounding rock of the main roadway. The research results can provide a scientific basis and engineering reference for the design of stop-mining coal pillars in mines with similar geological conditions.

21 February 2024 in Processes
Verified
Journal Article
Open access
PDF file
QLQizhen Li
Qizhen Li
Gangwei FanGangwei Fan
Gangwei Fan
Dongsheng ZhangDongsheng Zhang
Dongsheng Zhang
WYWei Yu
Wei Yu
SZShizhong Zhang
Shizhong Zhang
YFYue Fu
Yue Fu
After a mine water inrush occurs, it is crucial to quickly identify the source of the water inrush and the key control area, and to formulate accurately efficient water control measures. According to the differences in water chemical characteristics of four aquifers in the Fenyuan coal mine, the concentrations of K+~Na+, Ca2+, Mg2+, Cl−, SO42−, and HCO3− were taken as water source identification indexes. A decision tree classification model based on the C4.5 algorithm was adopted to visualize the chemical characteristics of a single water source and extract rules, and intuitively obtained the discrimination conditions of a single water source with Mg2+, Ca2+, and Cl− as important variables in the decision tree: Mg2+ < 39.585 mg/L, Cl− < 516.338 mg/L and Mg2+ ≥ 39.585 mg/L, Ca2+ < 160.860 mg/L. Factor analysis and Fisher discriminant theory were used to eliminate the redundant ion variables, and the discriminant function equations of the two, three, and four types of mixed water sources were obtained successively in turn. This paper puts forward MSE, RMSE, and MAE as the evaluation indexes of the water source mixing degree calculation models and obtains the ranking of the pros and cons of the mixed water source mixing degree calculation models. The results show that the minimum inscribed circle analytical method is the optimal model for the calculation of the mixing degree of two types of water sources, and the MSE, RMSE, and MAE are 0.17%, 4.13%, and 4.13%, respectively. The minimum inscribed circle clustering method is the optimal model for the calculation of the mixing degree of three types of water sources, and the minimum distance method is the optimal model for the calculation of the mixing degree of four types of water sources. The method of mine water source identification based on the decision tree C4.5 algorithm and mixing degree calculation has the characteristics of a simple calculation process, high efficiency, objective accuracy, and low cost, which can provide a scientific basis for the development of stope water control measures.

7 November 2025 in Applied Sciences
Verified
Journal Article
Open access
PDF file
MZMingjian Zhang
Mingjian Zhang
HTHaochen Tong
Haochen Tong
SZShizhong Zhang
Shizhong Zhang
SZShizhong Zhang
Shizhong Zhang
ZKZihan Kong
Zihan Kong
CRChuangnan Ren
Chuangnan Ren
To optimize the support performance of rock bolts in high-stress environments, this study employs the ANSYS (Version 2022 R2) finite element numerical simulation method to systematically investigate the influence of bolt geometrical parameters (rib spacing, rib height, and bolt diameter) on the stress state of the anchoring system. A bolt–resin–sleeve model was established to analyze Mises equivalent stress distribution and peaks under a 150 kN pull-out load. The simulation results indicate that a rib spacing of 36 mm effectively promotes the diffusion of pre-stress into deeper regions, with peak stress in the bolt rod and resin ring increasing by 34.42% and 61.64%, respectively, compared to a spacing of 12 mm. Further increase in rib spacing provides limited enhancement in peak stress. A rib height of 1.0 mm achieves optimal system performance without excessively compromising the interfacial stress level. Increasing the diameter to 22 mm raised peak stress in the bolt, sleeve, and resin by 14.19%, 30.48%, and 50.77%, respectively, compared to 18 mm, balancing load capacity and material use efficiently. The optimal parameter set (36 mm spacing, 1.0 mm height, and 22 mm diameter) was validated in a field trial in Zhongmacun Mine’s 3903 East Transportation Bottom Drainage Roadway. Monitoring recorded maximum roof subsidence of 102.9 mm, stabilizing within 25 days (daily deformation < 0.2 mm), confirming the excellent performance of the bolt support system with this parameter combination in high-stress roadways. This study provides a theoretical basis and engineering reference for the optimal design of high-performance rock bolts.

10 June 2026 in Processes
Verified
Journal Article
Open access
PDF file
MDMan Zhou Di
Man Zhou Di
GXGuangzheng Xu
Guangzheng Xu
SZShizhong Zhang
Shizhong Zhang
SZShizhong Zhang
Shizhong Zhang
PLPang Liang
Pang Liang
YLYiQun Li
YiQun Li
To address the large deformation and instability of gob-side entry roofs in soft, thick coal seams induced by residual cavities left by hydraulic flushing, the 1609 working face of Jiulishan Coal Mine was selected as the engineering background. Field investigation, numerical simulation, and industrial field testing were combined to investigate the deformation and failure characteristics of surrounding rock and the corresponding control technology for gob-side entries with cavity-bearing roofs. The results indicate that residual cavities created by hydraulic flushing disrupt the stress transfer path within the roof, causing stress field distortion and expansion of tensile stress zones, thereby significantly weakening the roof load-bearing capacity. As the cavity size increases, the surrounding rock deformation and plastic zone continuously expand. When the cavity size exceeds 1.0 m, roof subsidence exhibits a nonlinear increase, and the fractured zone around the cavity connects with the roof plastic zone, forming a continuous failure band that serves as the key factor leading to surrounding rock instability. Based on the deformation characteristics of the cavity-bearing roof, namely shallow fragmentation, deep-seated separation, and structural instability, a collaborative control technology consisting of multi-level cable bolts, steel-beam reinforcement, and grouting through injection pipes was proposed. By establishing a shallow–intermediate–deep hierarchical load-bearing structure and reinforcing the fractured cavity zone through grouting, the technology reconstructs the surrounding rock load-bearing system and optimizes the stress environment. Field application results show that, for a roof containing a 1.5 m cavity, the maximum roof subsidence and separation were controlled within 102 mm and 55 mm, respectively, and the roadway maintained a stable condition throughout the monitoring period. The findings provide both a theoretical basis and engineering guidance for surrounding rock control of gob-side entries with cavity-bearing roofs in soft, thick coal seams.

14 October 2026 in Sustainability
Verified
Journal Article
Open access
PDF file
JXJiaotao Xu
Jiaotao Xu
XLXiangling Li
Xiangling Li
SZShizhong Zhang
Shizhong Zhang
TATieliang An
Tieliang An
SZShizhong Zhang
Shizhong Zhang
ZWZiquan Wu
Ziquan Wu
With the gradual depletion of high-quality and readily mineable coal resources, recovering coal beneath buildings while controlling surface subsidence is important for sustainable resource development and protection of surface structures. Using the 11205 working face of Taitou Coal Mine as a case study, a three-roadway continuous mining and backfilling scheme combined with compact backfilling by grout injection into bags was proposed, and Fast Lagrangian Analysis of Continua in 3 Dimensions (FLAC3D) simulations were performed to evaluate the effects of branch-roadway width and backfilling ratio. At a 97% backfilling ratio, increasing branch-roadway width from 4 to 6 m increased maximum roof subsidence from 40.41 to 65.21 mm, maximum horizontal displacement from 1.220 to 2.174 mm, and the stress concentration factor from 2.62 to 2.96. At a 5 m width, increasing the backfilling ratio from 83% to 89% reduced maximum roof subsidence by 14.4%, whereas increasing it from 90% to 97% reduced subsidence by only 0.35 mm, indicating a pronounced diminishing-return response with markedly reduced sensitivity around 89–90%. Considering both subsidence control and construction efficiency, a branch-roadway width of 5 m and a backfilling ratio of 95% were selected. Field monitoring showed maximum strike and dip subsidence of 16.60 and 17.93 mm within 30 days. These results provide a reference for subsidence-controlled coal recovery beneath buildings under similar conditions.