Jingjing Wang

Prof. Dr. Jingjing Wang


Research Focus & Metrics

Academic Career Length

5Years (2022-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
14 July 2022 in Applied Sciences
Verified
Journal Article
Open access
PDF file
XZXuefeng Zhao
Xuefeng Zhao
MLMengxuan Li
Mengxuan Li
Zhe SunZhe Sun
Zhe Sun
YZYue Zhao
Yue Zhao
YGYihao Gai
Yihao Gai
HLhuang lingli
huang lingli
Intelligent construction and management processes are essential to ensure the efficiency of planting and maintenance of landscapes in large-scale projects. Unfortunately, various challenges still exist for achieving such a vision. For instance, creating detailed models of various plants to precisely capture the spatiotemporal changes is challenging. Moreover, transmitting massive plant-related data in time for project coordination and remote maintenance is also difficult through traditional landscape management practices. Integrated use of building information modeling (BIM) and mixed reality (MR) techniques could help establish digital representations of various plants with semantic information. Such integration of BIM and MR offers instinctual interactions by blending the physical and digital worlds. This study proposed an intelligent construction and management framework through BIM and MR to (1) establish detailed models of various plants, (2) capture spatiotemporal changes of plants across four seasons for model updating, and (3) establish a real-time data transmission method for effective project coordination and remote maintenance of various plants. The authors used the Jinhu Park project in the Xiong’an New District of China as a case study to validate the proposed method. Results show that the proposed method could support the sustainable development of landscapes in real practice.

4 June 2026 in Buildings
Verified
Journal Article
Open access
PDF file
ZWZeqiang Wang
Zeqiang Wang
YZYifeng Zhao
Yifeng Zhao
ZLZhansheng Liu
Zhansheng Liu
GGGuanqing Gao
Guanqing Gao
JWJingjing Wang
Jingjing Wang
To address the monitoring needs for carbon emissions during the construction phase, this paper proposes an intelligent analysis method based on construction activities. Fine-grained monitoring of construction carbon emissions is achieved through the collaborative application of a carbon emission quantification model, a digital twin monitoring model, and a Long Short-Term Memory (LSTM) prediction model. Firstly, based on three dimensions—time, space, and elements—the method constructs a quantification model for construction carbon emissions grounded in construction activities. This model accurately captures the dynamic relationships between material transportation losses, construction machinery usage, and carbon emissions. Secondly, leveraging digital twin technology, an integrated monitoring model is established, unifying three dimensions: element information, temporal processes, and model hierarchy. This model enables continuous data acquisition during the construction period. Finally, a Long Short-Term Memory (LSTM) neural network is introduced to enhance the accuracy of carbon emission predictions. Using a public building in Beijing as a case study, the research demonstrates that, with the traditional inventory method as a baseline (which exhibited a deviation of 18–25% from actual emissions verified through post-construction reconciliation), the proposed activity-based model reduced the calculation deviation for core division works to within 3.2%, an absolute reduction of approximately 15–22% points. The LSTM prediction model achieves an overall short-term prediction accuracy of 89%, with the Mean Absolute Percentage Error (MAPE) reaching approximately 11% across the full validation set. For a representative two-week forecasting case, the model yields a MAPE of 4.3%, with a deviation of 23 tCO2e between predicted and actual emissions. This provides a viable technical pathway for carbon emission monitoring during the construction phase of building projects.

19 January 2026 in Infrastructures
Verified
Journal Article
Open access
PDF file
BZBo Zhao
Bo Zhao
BGBangyan GUO
Bangyan GUO
DYDan Ye
Dan Ye
MXMingzhu Xiu
Mingzhu Xiu
JWJingjing Wang
Jingjing Wang
Against the backdrop of global climate change and China’s “dual-carbon” goals, carbon emissions from the construction phase of transportation infrastructure, particularly the rapidly expanding railway network, have garnered significant attention. However, systematic research and general evaluation models targeting the factors influencing carbon emissions during the railway bridge construction phase remain insufficient. To address this gap, this study presents a novel low-carbon evaluation model that integrates the analytic network process (ANP) and the fuzzy comprehensive evaluation (FCE) method. First, a carbon accounting model covering four stages—material production, transportation, construction, and maintenance—is established based on life cycle assessment (LCA) theory, providing a data foundation. Second, an innovative low-carbon evaluation index system for railway bridges, comprising 5 criterion layers and 23 indicator layers, is constructed. The ANP method is employed to calculate weights, effectively capturing the interdependencies among indicators, while the FCE method handles assessment ambiguities, forming a comprehensive evaluation framework. A case study of the bridge demonstrates the model’s effectiveness, yielding an evaluation score of 82.38 (“excellent” grade), which is consistent with expert judgement. The ranking of indicator weights from the model is highly consistent with the actual carbon emission inventory ranking (Spearman coefficient of 0.714). Key indicators—C21 (use of high-performance materials), C22 (concrete consumption), and C25 (transportation energy consumption)—collectively account for approximately 60% of the total impact, accurately identifying the major emission sources. This research not only verifies the model’s efficacy in pinpointing critical carbon sources but also provides a scientific theoretical basis and practical tool for low-carbon decision-making and optimization in the planning and design stages of railway bridge projects.