The EU Directive 2018/2001 recognized wastewater as a renewable heat source. Wastewater from domestic, industrial and commercial developments maintains considerable amounts of thermal energy after discharging into the sewer system. It is possible to recover this heat by using technologies like heat exchangers and heat pumps; and to reuse it to satisfy heating demands. This paper presents a review of the literature on wastewater heat recovery (WWHR) and its potential at different scales within the sewer system, including the component level, building level, sewer pipe network level, and wastewater treatment plant (WWTP) level. A systematic review is provided of the benefits and challenges of WWHR across each of these levels taking into consideration technical, economic and environmental aspects. This study analyzes important attributes of WWHR such as temperature and flow dynamics of the sewer system, impacts of WWHR on the environment, and legal regulations involved. Existing gaps in the WWHR field are also identified. It is concluded that WWHR has a significant potential to supply clean energy at a scale ranging from buildings to large communities and districts. Further attention to WWHR is needed from the research community, policymakers and other stakeholders to realize the full potential of this valuable renewable heat source.
To avoid the geographical and topographical prerequisites of the conventional pumped hydro energy storage, the use of underground cavities as water reservoirs allows countries without steep topography, such as Belgium, to increase the potential of the energy storage capacity. Belgium abounds in disused mines and quarries convertible into water basins. In this article, two Belgian case studies are presented and discussed for their singularity. A slate quarry in Martelange is discussed in technical aspects proposing three operating scenarios. Moreover, a preliminary economic analysis of the underground pumped storage system and a greenhouse gas emission evaluation for the storage system’s lifetime are presented. The analysis for a 100 MW power plant estimates a total initial investment of over 12 million euros and two million of CO avoided over its lifetime. This article also proposes the use of the coal mine 500 m deep of Pérronnes-lez-Binche. The mine representation discussed here offers a high energy capacity, but the substantial head drop (from about 500 to 200 m) challenges the selection of the hydraulic turbomachinery. A 1D simulation computed in SIMSEN draws out the behaviour of the unusual hydraulic configuration of turbines in series.