Shiyuan Xie

Dr. Shiyuan Xie


Research Focus & Metrics

Academic Career Length

4Years (2023-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
8 May 2023 in Processes
Verified
Journal Article
Open access
PDF file
ZLZongyu Lu
Zongyu Lu
JLJun Li
Jun Li
WLWei Lian
Wei Lian
SXShiyuan Xie
Shiyuan Xie
XWXuegang Wang
Xuegang Wang
LSLin Song
Lin Song
The sustained casing pressure (SCP) phenomenon of shale gas and oil wells occurs frequently after fracturing; therefore, in order to assess the cement sheath’s integrity in the vertical well portion, the cement stones were subjected to a compression test under different temperatures and confining pressures to obtain the mechanical parameters of the cement sheath at different well depths. The integrity of the cement ring between the production casing and the intermediate casing was then investigated using the Moore–Coulomb criterion. We also took into account other elements including pump pressure, production casing wall thickness, and cement ring mechanical properties. The results show that (1) the compressive strength, Poisson’s ratio, and Young’s modulus of cement stone vary obviously under different confining pressures and temperature conditions, and the cement stone shows elastic–brittle failure characteristics at 20 °C. The compressive strength, Poisson’s ratio, and Young’s modulus increase with the confining pressure, but the Young’s modulus and compressive strength gradually decrease with the increase in temperature, while the stress–strain curves show obvious plastic failure characteristics at 80 °C and 130 °C. (2) The tangential tensile stress decreases and depth increases from the wellhead to the intermediate casing shoe, while the radial compressive stress of the cement sheath increases. The stress state of the cement sheath changes abruptly at the position of the casing shoe due to the change in casing layers, and under the intermediate casing shoe, the tangential tensile stress changes from tension to compression. When a conventional cementing slurry system is used, the integrity of the cement sheath above the intermediate casing shoe will fail during fracturing. (3) Reducing the pump pressure and increasing casing wall thickness can reduce the tangential and radial stresses of the cement sheath, but the integrity of cement sheath cannot be fully guaranteed. For the cement sheath’s sealing integrity, it is advantageous to decrease the Young’s modulus and raise its strength.

22 May 2025 in Processes
Verified
Journal Article
Open access
PDF file
JWJiwei Wu
Jiwei Wu
XWXuegang Wang
Xuegang Wang
SXShiyuan Xie
Shiyuan Xie
YWYanxian Wu
Yanxian Wu
YLYilin Li
Yilin Li
DYDandan Yuan
Dandan Yuan
Existing studies have not considered the impact of interface bond strength on the ease of crack propagation at the cement sheath interface. Through Brazilian splitting and direct shear tests, the normal and shear bond strengths at interfaces I and II of a cement sheath were quantified. Based on this, a crack propagation model for the cement sheath interface was established using cohesive zone elements. The propagation characteristics of cracks along the axial and circumferential directions at interfaces I and II of a cement sheath during hydraulic fracturing were analyzed, along with their influencing factors. The results show that, due to the difference in interface bond strength, the crack propagation rate and length at interface I in the axial direction are greater than those at interface II, while the interface II crack is more likely to propagate in the circumferential direction. The elastic modulus of the cement sheath is a key factor affecting the integrity of the cement seal. Both excessively low and high elastic moduli can lead to different forms of failure in the cement sheath. It is recommended to control the elastic modulus of the cement sheath between 7 and 8 GPa. As the internal casing pressure increases, the axial propagation length of cement sheath interface cracks also increases. During fracturing, reducing pump pressure can reduce the axial crack propagation length in the cement sheath, alleviating or preventing the risk of fluid migration between stages and clusters. The findings of this study provide theoretical references and engineering support for the control of cement sheath seal integrity.

15 January 2026 in Eng
Verified
Journal Article
Open access
PDF file
XWXuegang Wang
Xuegang Wang
SXShiyuan Xie
Shiyuan Xie
HZHao Zhang
Hao Zhang
ZGZhigang Guan
Zhigang Guan
SZShengdong Zhou
Shengdong Zhou
WLWei Lian
Wei Lian
As the retrieval of unconventional oil and gas resources extends to the deep and ultra-deep domains, the issue of cement sheath failure in shale oil wellbores seriously endangers wellbore safety, making it imperative to uncover the relevant damage mechanism and develop effective assessment approaches. In response to the limitations of conventional finite element methods in representing mesoscopic damage, in this study, we determined the mesoscopic parameters of cement paste via laboratory calibrations; constructed a 3D casing–cement sheath–formation composite model using the discrete element method; addressed the restriction of the continuum assumption; and numerically simulated the microcrack initiation, propagation, and interface debonding behaviors of cement paste from a mesomechanical viewpoint. The model’s reliability was validated using a full-scale cement sheath sealing integrity assessment apparatus, while the influences of fracturing location, stage count, and internal casing pressure on cement sheath damage were analyzed systematically. Our findings indicate that the DEM model can precisely capture the dynamic evolution features of microcracks under cyclic loading, and the results agree well with the results of the cement sheath sealing integrity evaluation. During the first internal casing pressure loading phase, the microcracks generated account for 84% of the total microcracks formed during the entire loading process. The primary interface (casing–cement sheath interface) is fully debonded after the second internal pressure loading, demonstrating that the initial stage of cyclic internal casing pressure exerts a decisive impact on cement sheath integrity. The cement sheath in the horizontal well section is subjected to high internal casing pressure and high formation stress, resulting in more frequent microcrack coalescence and a rapid rise in the interface debonding rate, whereas the damage progression in the vertical well section is relatively slow.