The expansion of the roadway surrounding rock failure zone may connect the floor aquifer and cause the roadway water inrush. In order to reveal the mechanism of the roadway water inrush above confined water, we established the force model of the roadway surrounding rock above confined water in nonuniform stress field and studied the shape characteristics and expansion law of the roadway surrounding rock plastic zone. The results show that the roadway surrounding rock will form three kinds of plastic zone under different lateral pressure coefficients: circular, elliptical, and butterfly; when the shape of plastic zone is circular or elliptic, the maximum radius increases linearly with the increase of regional stress; when the shape is butterfly, the maximum radius increases exponentially with the increase of stress. Under the condition of a larger bidirectional stress ratio, the surrounding rock of the roadway will show butterfly-shaped failure, and small stress change will cause malignant expansion of the plastic zone; when the plastic zone is connected with the underlying aquifer, confined water of floor will enter the rock mass from the water diversion point and eventually flood into the roadway, causing floor water inrush.
The Zhaogu No. 2 coal mine is a single thick coal seam mining mine with high gas content. Due to the lack of protective layer mining conditions, we can only arrange the floor gas extraction roadway (FGER) to extract the gas from the overlying coal seam of the FGER to ensure safe production. However, improper placement of FGER will cause water inrush from the floor of FGER. Given above contradictions, this paper analyzes the stress-strain relationship of the fractured rock mass in the caving zone and the stress-recovery characteristics of the goaf from the perspective of the structural characteristics of the overlying strata above goaf. Based on this, a FLAC3D numerical model of equivalent delayed filling of caving rock mass was established by using the double-yield model filling method. The distribution of floor stress under the influence of mining is obtained after the model calculation, i.e., with the increase of the distance from the floor, the ratio of bidirectional stress to the peak value, and the stability value decrease, but the decrease amplitude becomes smaller and smaller. Therefore, floor roadway used for gas extraction should be located 10-15m below the floor. Combined with the distribution of floor strata in 11060 working face, it is finally determined that FGER should be located 13m below the floor. Such arrangement of FGER can not only ensure the effect of gas drainage but also prevent the occurrence of water inrush from floor.
The surrounding rock failure range of floor drainage roadway under the mining influence and its effect on the aquiclude are the key to determine the aquiclude thickness of the floor. This paper studied the distribution characteristics of the surrounding rock plastic zone by the numerical simulation when the floor drainage roadway was located at different positions under the working face and determined the rational position. Results show that (1) when the floor drainage roadway is staggered inward, the floor surrounding rock is prone to appear the butterfly plastic zone under single work face mining. And the butterfly plastic zone increases sharply after being affected by secondary mining of adjacent working face. (2) When the floor drainage roadway is staggered outward, the floor surrounding rock plastic zone extends gently affected by a single working face. And the depth of the plastic zone has no obvious change after being affected by secondary mining of adjacent working face. (3) According to the risk of water inrush, the three layout schemes can be ranked as follows: . (4) Considering the floor stress environment, gas extraction efficiency, and water prevention and control, the reasonable location of floor drainage roadway below the No. 11060 working face of Zhaogu No. 2 Coal Mine was finally determined. It was arranged in the sandy mudstone layer on the upper part of L9 limestone under the middle part of coal pillar and was drived along the seam floor.