Büşra Alptekin

Ms. Büşra Alptekin

orcid

Research Focus & Metrics

Academic Career Length

7Years (2020-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
8 August 2021
Verified
Book Chapter
Closed access
PDF file
TDTaner Dursun
Taner Dursun
FBFatih Birinci
Fatih Birinci
BABüşra Alptekin
Büşra Alptekin
ISIsa Sertkaya
Isa Sertkaya
OHOrkun Hasekioglu
Orkun Hasekioglu
SZSelim Zaim
Selim Zaim

1 January 2018 in Journal of Cleaner Production
Verified
Journal Article
Closed access
SFStephen Fox
Stephen Fox
BABüşra Alptekin
Büşra Alptekin

26 October 2020
Verified
Book Chapter
Closed access
PDF file
BABüşra Alptekin
Büşra Alptekin
BTBahadır Tunaboylu
Bahadır Tunaboylu
SZSelim Zaim
Selim Zaim
PPPietro Perlo
Pietro Perlo

24 October 2026 in World Electric Vehicle Journal
Verified
Journal Article
Open access
PDF file
BABüşra Alptekin
Büşra Alptekin
Sule Itir SatogluSule Itir Satoglu
Sule Itir Satoglu
MMMattia Marinelli
Mattia Marinelli
Planning charging infrastructure is essential to support the growing use of electric vehicles (EVs) and is particularly critical for long-distance travel, where reliable access along the route cannot be assumed. Because meeting the diverse goals of electromobility stakeholders at once requires balancing economic, environmental, and social priorities, this study develops a multi-objective mixed-integer linear program that jointly optimizes investment cost, CO2 avoided through photovoltaic (PV) generation, and regional demand coverage for EV charging infrastructure along intercity highway corridors. As charging demand grows substantially over the planning horizon, the study adopts a multi-period formulation to support adaptive planning under Business-as-Usual (BAU) and Net Zero scenarios that represent different EV penetration and demand trajectories. The model is solved via the augmented ϵ-constraint method (AUGMECON2) and applied to the Istanbul–Ankara highway corridor, one of Türkiye’s busiest intercity motorway routes, through 2035. Results show that achieving the maximum environmental benefit raises investment cost by about 63% (BAU) and 30% (Net Zero) relative to the cost-minimal plan, while the highest coverage regime raises served demand by a factor of 2.9 and 3.4 at cost increases of about 40% and 33%, respectively. Across the resulting solutions, grid capacity is extended exclusively through PV rather than transformer upgrades, and economic and environmental optimization converge on a minimal, centralized footprint of five stations, whereas coverage-oriented planning requires opening all sixteen candidate locations. These findings suggest planners should first set a coverage target as a policy commitment, then treat PV as the default, lower-cost grid-reinforcement pathway under the cost assumptions of this study.